Cryptome DVDs. Donate $25 for two DVDs of the Cryptome collection of 47,000 files from June 1996 to January 2009 (~6.9 GB). Click Paypal or mail check/MO made out to John Young, 251 West 89th Street, New York, NY 10024. The collection includes all files of cryptome.org, cryptome.info, jya.com, cartome.org, eyeball-series.org and iraq-kill-maim.org, and 23,100 (updated) pages of counter-intelligence dossiers declassified by the US Army Information and Security Command, dating from 1945 to 1985.The DVDs will be sent anywhere worldwide without extra cost.


13 June 1997

Source: http://www.hnd.usace.army.mil/techinfo/cegssgml/16650.sec (SGML format)

See Guide Specifications for Military Construction: http://jya.com/cegs.htm

-------------------------------------------------------------------------------


  **************************************************************************  
  DEPARTMENT OF THE ARMY                               CEGS-16650 (May 1996)
  U.S.  ARMY CORPS OF ENGINEERS                        _____________________
                                  GUIDE SPECIFICATION FOR MILITARY CONSTRUCTION  
  **************************************************************************  

                               SECTION 16650
                       ELECTROMAGNETIC (EM) SHIELDING

                                   05/96

  **************************************************************************  
                NOTE:  This guide specification covers the
                requirements for electromagnetic shielded
                facilities.  This guide specification is to be
                used in the preparation of project specifications in
                accordance with ER 1110-345-720.  
  **************************************************************************  
  
PART 1   GENERAL

  **************************************************************************  
                NOTE:  The following information will be shown on
                the project drawings:   
  
                1.  Assembly details.  
  
                2.  Typical penetration details.  
  
                3.  Method of mounting shielded enclosure within
                building.  
  
                4.  Shield penetration plan containing wall
                elevations, floor and ceiling plans showing the
                locations of all penetrations (to include all mech.,
                electrical, fire protection, etc.) to the HEMP
                shield.  
  
                5.  Location of mechanical and electrical equipment
                within shielded enclosure.  
  
                6.  Detail equipment mounted or suspended from the
                shielded ceiling.  
  
                7.  Shield penetration schedule to include:  
                a.  Location of the waveguide.  
                b.  Size of waveguide (dimensions).  
                c.  No. Of penetrations in the waveguide.  
                d.  Penetration designation of each penetration
                in the waveguide (if more than one).  
                e.  Size of pipe for each penetration in the
                waveguide.  
                f.  Type of pipe for each waveguide
                penetration.  
                g.  Type of penetration.  
                h.  The detail/sheet no. of the waveguide
                detail.  
                i.  Any remarks pertaining to the waveguide.  
  
                8.  Filter schedule to include:   
                a.  Location of filter.  
                b.  Type of filter (power or signal).  
                c.  No. Of filters in the filter enclosure.  
                d.  Electrical characteristics of the filter
                (voltage, amperage, no. of poles, frequency).  
                e. Purpose of the filter.  
                f.  The detail/sheet no. Of the typical filter
                detail.  
                g.  Any remarks pertaining to the filter.  
  
                9.  Typical filter details.  
  
                10.  Hardness critical items (HCI) should be
                identified using the (HCI) symbol on project
                drawings.  
  
                Refer to MIL-HDBK 419 for special grounding and
                bonding requirements for EM shielded enclosures.
                Refer to the U.S. Air Force Handbook for the Design
                and Construction of HEMP/TEMPEST and Other Shields
                in Facilities (March 1993).  This document can be
                obtained from HQ AFIC/LEEE, San Antonio, Texas
                78243-5001.  Also refer to AR 380-19.  MIL-HDBK 423
                should be used for projects requiring HEMP
                protection.  The designer should consult these
                documents and other appropriate sources before
                applying this guide specification to large-scale EM
                shielded enclosures or to HEMP or TEMPEST projects.
                The requirement for thermal expansion joints
                inherent to large-scale enclosures is not addressed
                in this guide specification.  The extent and
                location of the work to be accomplished and wiring,
                equipment, and accessories necessary for a complete
                installation should be indicated on the project
                drawings.  The Air Force contracts with an
                independent testing laboratory to perform their
                acceptance testing.  The test can consist of a SELDS
                or equivalent test and H-field and plane wave CW
                tests per MIL-STD 188 125 and/or IEEE STD 299.  See
                the U.S. Air Force Handbook for the Design and
                Construction of HEMP/TEMPEST and Other Shields in
                Facilities for more details.  Methodology and
                procedures for setting up equipment are contained in
                MIL-HDBK-423.  Full MIL-STD 188 125 acceptance
                testing (PCI tests as specified in appendix B)
                should be avoided.  (Also see designer notes K and
                U).  Although not addressed in this specification,
                fiber optic cable has gained acceptance as an
                effective method of transmitting data across the
                boundary of shielded enclosures without filtering.  
                If fiber optic cable is used, describe the waveguide
                penetration of the shield in detail.  Fiber optic
                cable is specified in CEGS 16768, FIBER OPTICS DATA
                TRANSMISSION SYSTEM.  
  **************************************************************************  
  
1.1   REFERENCES

  **************************************************************************  
                NOTE:  Issue (date) of references included in
                project specifications need not be more current than
                provided by the latest change (Notice) to this guide
                specification.  
  **************************************************************************  
  
  The publications listed below form a part of this specification to the
  extent referenced.  The publications are referred to in the text by basic
  designation only.

            AMERICAN HARDBOARD ASSOCIATION (AHA)  
  
  AHA A135.4    (1995) Basic Hardboard  
  
            AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)  
  
  AISC-MO16    (1989) ASD Manual of Steel Construction  
  
            AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)  
  
  ASTM A 36    (1994a) Carbon Structural Steel  
  
  ASTM A 123    (1989a) Zinc (Hot Dip Galvanized)
    Coatings on Iron and Steel Products  
  
  ASTM A 227    (1993) Steel Wire, Cold-Drawn for
    Mechanical Springs  
  
  ASTM A 366    (1991; R 1993) Steel, Sheet, Carbon,
    Cold-Rolled, Commercial Quality  
  
  ASTM A 526    (1990) Steel Sheet; Zinc-Coated
    (Galvanized) by the Hot-Dip Process,
    Commercial Quality  
  
  ASTM A 568    (1993a) Steel, Sheet, Carbon, and
    High-Strength, Low-Alloy, Hot-Rolled and
    Cold-Rolled, General Requirements for  
  
  ASTM A 569    (1991a; R 1993) Steel, Carbon (0.15
    Maximum, Percent), Hot-Rolled Sheet and Strip
    Commercial Quality  
  
  ASTM A 611    (1994) Steel, Sheet, Carbon, Cold-Rolled,
    Structural Quality  
  
  ASTM A 653    (1995) Steel Sheet, Zinc-Coated
    (Galvanized) or Zinc-Iron Alloy-Coated
    (Galvannealed) by the Hot-Dip Process  
  
  ASTM B 194    (1995) Copper-Beryllium Alloy Plate,
    Sheet, Strip, and Rolled Bar  
  
  ASTM B 545    (1992) Electrodeposited Coatings of Tin  
  
  ASTM B 633    (1985; R 1994) Electrodeposited Coatings
    of Zinc on Iron and Steel  
  
  ASTM E 84    (1995a) Surface Burning Characteristics
    of Building Materials  
  
  ASTM E 90    (1990) Laboratory Measurement of Airborne
    Sound Transmission Loss of Building
    Partitions  
  
            AMERICAN WELDING SOCIETY (AWS)  
  
  AWS A5.18    (1993) Carbon Steel Electrodes and Rods
    for Gas Shielded Arc Welding  
  
  AWS BRH    (1991) Brazing Handbook  
  
  AWS D1.1    (1994) Structural Welding Code - Steel  
  
  AWS D1.3    (1989) Structural Welding Code - Sheet
    Steel  
  
  AWS D9.1    (1990) Sheet Metal Welding Code  
  
            DEPARTMENT OF COMMERCE (DOC)  
  
  DOC PS 1    (1983) Construction and Industrial
    Plywood  
  
            INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)  
  
  IEEE C62.11    (1993) IEEE Standard Metal-Oxide Surge
    Arresters for AC Power Circuits  
  
  IEEE C62.33    (1982; R 1994) Varistor Surge-Protective
    Devices  
  
  IEEE C62.41    (1991) Surge Voltages in Low-Voltage AC
    Power Circuits  
  
  IEEE STD 142    (1991) IEEE Recommended Practice for
    Grounding of Industrial and Commercial Power
    Systems  
  
  IEEE STD 299    (1991) IEEE Standard Method of Measuring
    the Effectiveness of the Electromagnetic
    Shielding Enclosures  
  
            MILITARY HANDBOOKS (MIL-HDBK)  
  
  MIL-HDBK 419    (Rev A) Grounding, Bonding, and Shielding
    for Electronic Equipments and Facilities  
  
            MILITARY STANDARDS (MIL-STD)  
  
  MIL-STD 188 124    (Rev B) Grounding, Bonding and Shielding
    (Metric)  
  
  MIL-STD 188 125    (Rev A) High-Altitude Electromagnetic
    Pulse (HEMP) Protection for Ground-Based C4I
    Facilities Performing Critical, Time-Urgent
    Missions, Vol. I Fixed Facilities (Metric)  
  
  MIL-STD 220    (Rev A; Notice 1 & 2) Method of
    Insertion-Loss Measurement  
  
            NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)  
  
  NEMA ICS 2    (1993) Industrial Control Devices,
    Controllers and Assemblies  
  
  NEMA ICS 6    (1993) Enclosures for Industrial Controls
    and Systems  
  
  NEMA MG 1    (1993; Rev 1-1993; Rev 2-1995) Motors and
    Generators  
  
            NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)  
  
  NFPA 70    (1996) National Electrical Code  
  
  NFPA 77    (1993) Static Electricity  
  
  NFPA 80    (1995) Fire Doors and Windows  
  
  NFPA 80A    (1993) Protection of Buildings from
    Exterior Fire Exposures  
  
  NFPA 101    (1994) Safety to Life from Fire in
    Buildings and Structures  
  
  NFPA 780    (1992) Installation of Lightning
    Protection Systems  
  
            UNDERWRITERS LABORATORIES (UL)  
  
  UL 486A    (1991; Rev Oct 1991) Wire Connectors and
    Soldering Lugs for Use with Copper Conductors  
  
  UL 1283    (1993; Rev Aug 1993) Electromagnetic
    Interference Filters  
  
  UL 1449    (1985; Errata Apr 1986) Transient Voltage
    Surge Suppressors  
  
1.2   SYSTEM DESCRIPTION

  **************************************************************************  
                NOTE:  Projects involving military communications
                equipment must be designed to incorporate the
                applicable requirements of MIL-STD 188 124, which
                will be provided in the ELECTRICAL WORK, INTERIOR
                specification.  
  **************************************************************************  
  
  The shielded facility shall meet or exceed minimum attenuation decibel (dB)
  levels specified herein.  The EM shielding system shall include, but is not
  limited to, the following:

  a.  The [welded steel] [bolted] EM shield.

  b.  EM shielded doors for access into the facility.

  c.  Electrical and electronic penetrations of the shield.

  d.  EM filter/surge arrester assemblies, including their EM enclosures.

  e.  EM shielded pull boxes and junction boxes.

  f.  EM shielded conduit runs.

  g.  Special protective measures for mission-essential equipment outside
  the EM shield.

  h.  Structural penetrations.

  i.  Mechanical and utility penetrations (such as air ducts, gas, and
  water).

  j.  Instrumentation and control.

  k.  Equipment door/access panels.

1.3   SUPERVISION

  Work performed under this section shall be supervised and inspected by the
  shielding specialist.  Materials and equipment shall be approved and
  verified by the shielding specialist before being submitted to the
  Contracting Officer for approval.  The submittal shall be date stamped and
  signed by the shielding specialist.  The shielding specialist shall be
  responsible for coordinating the required shielding work with the work of
  all other trades that will interface or affect the shielding work in any
  way.  The contractor shall provide sufficient supervisory and/or quality
  control personnel on site to supervise the installation crew and to conduct
  in-progress quality assurance tests.

1.4   SUBMITTALS

  **************************************************************************  
                NOTE:  Submittals must be limited to those necessary
                for adequate quality control.  The importance of an
                item in the project should be one of the primary
                factors in determining if a submittal for the item
                should be required.  
  
                Indicate submittal classification in the blank space
                using "GA" when the submittal requires Government
                approval or "FIO" when the submittal is for
                information only.  
  **************************************************************************  
  
  Government approval is required for submittals with a "GA" designation;
  submittals having an "FIO" designation are for information only.  The
  following shall be submitted in accordance with Section 01300 SUBMITTAL
  PROCEDURES

  SD-01 Data

  Electromagnetic Shielding System; GA.

  Manufacturer's data, catalog cuts, and printed documentation regarding the
  work.

  SD-04 Drawings

  Electromagnetic Shielding System; GA.

  Installation details showing location, number, and method of penetrating
  the shielding material.  Fabrication details for penetrations of the
  shielding material and the complete EM shielded enclosure to include doors
  and filters.  Drawings shall show erection details and sequence of erection
  and shall clearly indicate the methods necessary to ensure shield integrity
  under all columns and other structural members.

  SD-06 Instructions

  EM Shielding System Installation Plan; GA.  Quality Control
  Plan; GA.

  Instruction for the shielding installation provided by the shielding
  installers.

  SD-07 Schedules

  EM Door; GA.  EM Filter Assemblies; GA.  EM Penetrations
  Schedule; GA.

  Filter schedule shall include voltage, amperage, enclosure type (low, high,
  band pass), system, location, cut-off frequency, band pass frequencies, and
  electrical surge arresters (ESA).

  SD-08 Statements

  EM Shielding Specialist Qualifications; GA.  EM Shielding Testing
  Specialist Qualifications; GA.  EM Shielding Installers
  Qualifications; GA.  Welders Qualifications; GA.

  SD-09 Reports

  Enclosure Sound Transmission Testing; GA.  Swinging Door Static
  Load Test; GA.  Swinging Door Sag Test; GA.  Door Closure
  Test; GA.  Door Handle-Pull Test; GA.  Door EM Shielding
  Effectiveness Test; GA.  Door Sound Transmission Test; GA.  
  Filter Current Overload Capability Test; GA.  Filter Insertion
  Loss Test; GA.  Filter Operating Temperature and Temperature Rise
  Test; GA.  Filter Voltage Drop Test; GA.  Filter Dielectric
  Withstand Voltage Test; GA.  Filter Insulation Resistance Test;
  GA.  Filter Enclosure Shielding Effectiveness Test; GA.
  Filter Terminals Test; GA.  Filter Harmonic Distortion Test;
  GA.  Filter Reactive Shunt Current Test; GA.  ESA Breakdown
  Voltage Test; GA.  ESA Impulse Sparkover Voltage Test; GA.  
  ESA Clamping Voltage Test; GA.  ESA Extinguishing Test; GA.  
  ESA Extreme Duty Discharge Test; GA.  ESA Surge Life Test;
  GA.  EM Waveguide Assembly Testing; GA.  EM Cabinet and Pull
  Box Shielding Effectiveness Testing; GA.  Field Testing Reports;
  GA.

  SD-13 Certificates

  Welders Certification; GA.

  SD-18 Records

  Field Testing Results; FIO.

  SD-19 Operation and Maintenance Manuals

  EM Shielding System; FIO.

1.5   QUALIFICATIONS

1.5.1   Shielding Specialists, Installers and Testing Specialists

  The name and background qualifications of individuals who will be
  responsible for installation, supervision, and testing of the shielding
  systems on this project shall be provided.  Shielding and testing
  specialist credentials shall include a bachelor's degree in science or
  engineering and post-degree training and experience with EM shielding.

1.5.1.1   Testing Experience

  The testing specialist shall have experience during the previous 5 years in
  shielded enclosure leak detection system (SELDS), IEEE STD 299, and
  other methods of shielded enclosure testing.

1.5.1.2   Work Experience

  The EM shielded system shall be provided by an experienced firm or
  individual that has been regularly and successfully engaged in the
  installation, supervision, and/or testing of equivalent EM shielded systems
  for at least the previous 5 years.  The principal work of this firm or
  individual shall be the satisfactory installation and construction of EM
  shielded protection systems.  Such experience shall include achieving
  specified requirements for shielded system attenuation and maintainability
  of attenuation levels on work performed.

1.5.1.3   Project Experience

  A project experience list shall be furnished on projects of similar scope
  which have been completed during the previous 5 years.  Project completion
  dates and the name and telephone number of the user and/or owner of each
  project shall be included.  Project experience for installers shall
  indicate the installation responsibilities, performance, materials, and
  methods used.  Project experience for the shielding specialist shall
  indicate the responsibilities performed.  Project experience for the
  testing specialist shall indicate the test methods performed.

1.5.2   Qualifications of Welders

  Welding shall be performed by certified welders.  The Contractor shall
  provide the names of the welders to be employed and certification that each
  welder has passed qualification tests within the last 2 years in the
  processes specified in AWS D1.1, AWS D9.1, and as required by the
  Contracting Officer.

1.6   FILTER AND ELECTRICAL WORK REQUIREMENTS

  Filter and electrical work shall comply with NFPA 70, UL 486A, and
  UL 1283.  The label and listing of the Underwriters Laboratories or
  other nationally recognized testing laboratory shall be acceptable evidence
  that the material or equipment conforms to the applicable standards of that
  agency.  In lieu of the label or listing, a certificate may be furnished
  from an acceptable testing organization adequately equipped and competent
  to perform such services.  The certificate shall state that the items have
  been tested and that they conform to the specified standard.

1.7   FIELD EXAMPLES

  **************************************************************************  
                NOTE:  Requests for field examples and mock-ups
                usually add cost to the project.  Samples should
                only be required for special applications and should
                be limited to scaled-down items.  For example, the
                designer may ask for a welded floor/wall corner
                section.  Do not normally ask for samples of filters
                and full-size waveguide vents.  
  **************************************************************************  
  
  Field examples shall be provided for the following:  [shielding sheet
  installation,] [shielding fastening,] [doors,] [[30] [100] [_____] ampere
  power filter,] [communication filter,] [waveguide,] [penetration,] and
  [_____].

1.8   PREINSTALLATION CONFERENCE

  A preinstallation conference for EM shielding shall be held with the
  Contractor and installers working in, on, or near the EM shield.
  Coordination requirements shall be discussed and instructions shall be
  stated to ensure the integrity of the EM shield.

1.9   DELIVERY AND STORAGE


  Equipment shall be delivered and stored with protection from excessive
  humidity and temperature variation, dirt, and other contaminants.

1.10  FIELD MEASUREMENTS

  The Contractor shall become familiar with details of the work, verify
  dimensions in the field, and shall advise the Contracting Officer of any
  discrepancy before performing the work.

1.11   PROJECT/SITE REQUIREMENTS

  Welding of EM shielding material and sheet steel shall be performed at an
  ambient temperature of [10 degrees C] [50 degrees F] minimum to
  [32 degrees C] [90 degrees F] maximum.  Shielding shall not be
  installed until the building has been weather enclosed.  Sheet steel
  welding shall not be performed in direct sunlight.

1.12   EXTRA MATERIALS

  [One] [_____] extra EM power filter[s] and [one] [_____] extra
  communications filter[s] of each different type furnished on the project
  shall be furnished as a spare.

1.13   SOURCE QUALITY CONTROL

  Factory tests shall be performed as described herein.  The Contracting
  Officer reserves the right to witness the specified factory tests.  The
  Contracting Officer shall be notified at least 30 days before factory tests
  are scheduled to be performed.  Test data shall include a detailed
  description of the test instrumentation and equipment, including
  calibration dates, a detailed description of the test procedure, and the
  recorded test data.

1.14   OPERATING AND MAINTENANCE MANUAL

  The manual shall address all components and aspects of the EM shielding and
  shall include, but not be limited to, the following:

  a.  A complete set of assembly drawings to include penetration
  locations and installation details. 

  b.  The construction specification on EM shielding.

  c.  Shield penetration schedule.

  d.  Power/signal filter schedule.

  e.  Test plan.

  f.  The prepared preventive maintenance instructions for periodic
  inspection, testing and servicing, lubrication, alignment, calibration, and
  adjustment events normally encountered.  Complex preventive maintenance
  events shall be extracted from or shall refer to detailed vendor or
  manufacturer data.  This information shall be derived from an evaluation of
  engineering data considering local environmental conditions, manufacturer's
  recommendations, estimated operating life for the specific application and
  use of the equipment, and types of job skills available at the operating
  site.

  g.  Spare parts data approved and verified by the shielding specialist
  prior to submission.  The data shall include a complete list of recommended
  parts and supplies with current unit prices and source of supply.

  h.  Provide a list of hardness critical items (HCI) requiring periodic
  inspection to maintain EM shield integrity.  Hardness critical items are
  those components and/or construction features which singularly and
  collectively provide specific levels of HEMP protection, such as the EM
  shield, surge arresters, EM shielded doors, shield welding, electrical
  filters, honeycomb waveguides, and waveguides-below-cutoff.

PART 2   PRODUCTS

2.1   GENERAL

2.1.1   Standard Products

  Materials and equipment shall be the standard products of a manufacturer
  regularly engaged in the manufacture of such products and shall essentially
  duplicate items that have been in satisfactory use for at least 2 years
  prior to bid opening.  Equipment shall be supported by a service
  organization that is, in the opinion of the Contracting Officer, reasonably
  convenient to the site.

2.1.2   Nameplates

  Each major item of equipment shall have the manufacturer's name, address,
  type or style, model or serial number, and catalog number on a plate
  secured to the item of equipment.

2.1.3   Special Tools

  One set of special tools, calibration devices, and instruments required for
  operation, calibration, and maintenance of the equipment shall be provided
  as follows:

  [SELDS Test Set]

  [_____]

2.1.4   Testability

  Equipment and materials of the EM shielding shall be designed and built to
  facilitate testing and maintenance.

2.2   EM SHIELDING EFFECTIVENESS

  **************************************************************************  
                NOTE:  The designer will consider the shield as
                early in the design as possible while the geometry
                of the shielded enclosure can be located to utilize
                components inherent in the structure.  Failure to
                consider the shield configuration first in the
                design will increase design costs, cause problems in
                its incorporation into the structure, and lose
                installation simplicity.  The EM shielded enclosure
                design should be coordinated by the structural,
                mechanical, and electrical engineers and architect.  
                The structural and shielding systems should drive
                each other on large projects.  Multi-story shielded
                enclosures require continuous connections of
                shielding steel interconnected to the structural
                steel.  In these cases, the shielding wall layout
                should coincide with the structural steel beam
                layout.  The shield within an exterior building
                concept must employ a design which allows for
                settling, seismic motion, and differential thermal
                expansion between the steel and concrete of the
                building and the steel of the EM shielding.  
  **************************************************************************  
  
  The EM shielded enclosure complete with all filters, doors, and/or
  waveguides shall have the following minimum EM shielding effectiveness
  attenuation.  Minimum magnetic field attenuation shall be [20 dB] [_____]
  at 14 kHz increasing linearly to [50 dB] [100 dB] at [200 kHz] [1 MHz]
  [_____].  Minimum electric field and plane wave attenuation shall be [50
  dB] [100 dB] [_____] from 14 kHz to [1 GHz] [10 GHz] [_____].

2.3   EM SHIELDING ENCLOSURE REQUIREMENTS (WELDED CONSTRUCTION)

  **************************************************************************  
                NOTE:  For the EM shielding enclosure, choose either
                welded or bolted construction.  The unused method
                should be deleted from the project specification.  
                Welded construction will usually consist of
                continuous 1.897 mm (14 gauge) thick steel plate and
                angles to form the enclosure.  Thicker material may
                be used if it is more cost-effective or required for
                structural reasons.  Welded construction is used
                when a shielded facility requires a long
                maintainable service life of high-level protection,
                100 dB attenuation, or HEMP protection, 100 dB.
                Bolted construction is associated with a lower level
                (50 dB) of maintained shielding effectiveness.  
                Bolted construction will usually consist of modular
                panels bolted together with metal strips or
                channels.  Panels are commonly plywood with steel
                sheets laminated to one or both sides.  Bolted
                construction is used when a shielded facility's
                service life is short, 10 years or less, or the
                system is required to be demountable for change of
                location.  This system requires more maintenance
                than a welded system and requires access to the
                panels.  The EM shield layout may restrict
                attenuation testing of the enclosure.  It is
                desirable for large facilities to place the shield
                at least 1 meter (3.3 feet) inside the exterior
                walls, although cost and construction restrict this
                consideration.  The floor shielding can be tested by
                SELDS test but not by IEEE STD 299 if it is on
                grade.  The facility layout must be carefully
                planned to allow for testing and shield maintenance.  
  **************************************************************************  
  
2.3.1   Welded Shielding Enclosure

  **************************************************************************  
                NOTE:  Shielding steel thickness should not be based
                solely on the minimum thickness required for
                HEMP/TEMPEST attenuation.  Thicker steel may be
                necessary because of structural factors and heat
                deformation or burn-through from seam welding.  
  **************************************************************************  
  
  The intent of this section and the drawings is to provide a complete metal
  enclosure including floor, walls, ceiling, doors, penetrations, welds, and
  the embedded structural members to form a continuous EM shielded enclosure.
  Shielding sheets and closures shall be [1.897] [_____] mm [14]
  [_____] gauge thick cold-rolled steel for walls and ceiling conforming to
  ASTM A 366 and [3.416] [_____] mm [10] [_____] gauge thick
  hot-rolled steel for floors conforming to ASTM A 568 or ASTM A 569.  
  Steel plates, channels, or angles of minimum 6 mm 1/4 inch thick
  shall be used to reinforce shield sheets for attachments of ducts,
  waveguides, conduit, pipes, and other penetrating items.  Furring channels
  used to attach shielding sheets to walls or floors shall be the minimum
  gauge of the shielding steel.  The shielding sheet steel gauge may be
  thicker at the Contractor's option to reduce labor and welding effort only
  if structurally tolerable with the existing design.  Steel shall be free of
  oil, dents, rust, and defects.

2.3.2   Metal Members

  Structural steel shapes, plates, and miscellaneous metal shall conform to
  ASTM A 36.  Furring channels shall conform to ASTM A 611.

2.3.3   Steel and Welding Material

  Welding materials shall comply with the applicable requirements of AWS
  D1.1 and AWS D9.1.  Steel and welding material shall conform to
  AISC-MO16.  Welding electrodes shall conform to AWS D1.1 for metal
  inert gas (MIG) welding method.  Weld filler metal shall conform to AWS
  A5.18.

2.3.4   Fasteners

  Self-tapping screws shall not be used for attachment of shielding.
  Power-actuated drive pins shall be zinc-coated steel, Type I, pin size No.
  4 to secure steel sheets to concrete surfaces and to light gauge furring
  channels.  The drive pins shall conform to ASTM A 227 Class 1 for
  materials and ASTM B 633 for plating.

2.3.5   Miscellaneous Materials and Parts

  Miscellaneous bolts and anchors, supports, braces, and connections
  necessary to complete the miscellaneous metal work shall be provided.  The
  necessary lugs, rebars, and brackets shall be provided to assemble work.
  Holes for bolts and screws shall be drilled or punched.  Poor matching of
  holes will be cause for rejection.  Thickness of metal and details of
  assembly and supports shall provide ample strength and stiffness.  The
  materials shall be galvanically similar.

2.3.6   Penetrations

  **************************************************************************  
                NOTE:  Configure the facility to minimize the number
                of metallic structural elements required to
                penetrate the barrier.  
  **************************************************************************  
  
  Penetrations of the shield, including bolts or fasteners, shall be sealed
  with puddle welds or full circumferential EM welds.  Structural
  penetrations including beams, columns, and other metallic structural
  elements shall be provided with continuously welded or brazed seams and
  joints between the penetrating element and the shield.  Nonmetallic
  structural elements shall not penetrate the electromagnetic barrier.

2.3.7  Penetration Plates (Welded Construction)

  The penetration plate shall be the central location for treatment of
  penetrations.  The panel shall be constructed of 6 mm 1/4 inch
  thick ASTM A 36 steel plate welded to the shield.  Waveguide, conduit,
  and piping penetrations shall be circumferentially welded at the point of
  penetration to the inner surface of the penetration plate.  Penetration
  plates shall extend at least 150 mm 6 inches beyond all
  penetrations.

2.3.8   Floor Finish

  **************************************************************************  
                NOTE:  Indicate or specify whether other flooring is
                to be provided or higher floor loads are required.  
                This is most critical when raised floors are
                specified.  Allowances must be made for elevated
                door thresholds.  Specify special requirements for
                laboratory loads or seismic loading in this
                paragraph.  If concrete floor wearing slabs are
                specified, they should be thick enough to hold
                anchor bolts for equipment, supports, and interior
                partitions.  Concrete wearing slabs may be provided
                in most applications with a minimum thickness of 100
                mm (4 inches).  The Air Force is opposed to placing
                concrete wearing slabs over shielding steel because
                of problems with testing and repair.  Placing
                concrete over floor shielding requires a waiver from
                HQ AFCESA/ENE.  
  
                Indicate or specify whether other flooring is to be
                provided or higher floor loads are required.  This
                is most critical when raised floors are specified.  
                Allowances must be made for elevated door
                thresholds.  Specify special requirements for
                laboratory loads or seismic loading in this
                paragraph.  If concrete floor wearing slabs are
                specified, they should be thick enough to hold
                anchor bolts for equipment, supports, and interior
                partitions.  Concrete wearing slabs may be provided
                in most applications with a minimum thickness of 100
                mm (4 inches).  The Air Force is opposed to placing
                concrete wearing slabs over shielding steel because
                of problems with testing and repair.  Placing
                concrete over floor shielding requires a waiver from
                HQ AFCESA/ENE.  
  **************************************************************************  *
  
  Floor EM shielding shall be covered by a reinforced cast-in-place concrete
  slab [100] [_____] mm [4] [_____] inches thick.

2.4   EM SHIELDING ENCLOSURE REQUIREMENTS (BOLTED CONSTRUCTION)

  **************************************************************************  
                NOTE:  For the EM shielding enclosure, choose either
                welded or bolted construction.  The unused method
                should be deleted from the project specification.  
                Welded construction will usually consist of
                continuous 1.897 mm (14 gauge) thick steel plate and
                angles to form the enclosure.  Thicker material may
                be used if it is more cost-effective or required for
                structural reasons.  Welded construction is used
                when a shielded facility requires a long
                maintainable service life of high-level protection,
                100 dB attenuation, or HEMP protection, 100 dB.
                Bolted construction is associated with a lower level
                (50 dB) of maintained shielding effectiveness.  
                Bolted construction will usually consist of modular
                panels bolted together with metal strips or
                channels.  Panels are commonly plywood with steel
                sheets laminated to one or both sides.  Bolted
                construction is used when a shielded facility's
                service life is short, 10 years or less, or the
                system is required to be demountable for change of
                location.  This system requires more maintenance
                than a welded system and requires access to the
                panels.  The EM shield layout may restrict
                attenuation testing of the enclosure.  It is
                desirable for large facilities to place the shield
                at least 1 meter (3.3 feet) inside the exterior
                walls, although cost and construction restrict this
                consideration.  The floor shielding can be tested by
                SELDS test but not by IEEE STD 299 if it is on
                grade.  The facility layout must be carefully
                planned to allow for testing and shield maintenance.  
  **************************************************************************  
  
2.4.1   Panel Construction

  Flat steel sheets shall be laminated to each side of a 20 mm 3/4
  inch thick structural core of either plywood or hardboard.  Panels shall
  have a flame spread rating of less than 25 when tested according to ASTM
  E 84.  Flat steel shall conform to ASTM A 653 and ASTM A 526 with
  G-60 coating, minimum 0.5512 mm 26 gauge thick, zinc-coated
  phosphatized.  Plywood shall conform to DOC PS 1 for exterior, sound
  grade hardwood, Type I.  Hardboard shall conform to AHA A135.4, Class
  4, SIS, for standard type hardboard.  Adhesive for laminating steel sheets
  to structural core shall be a waterproof type which maintains a permanent
  bond for the lifetime of the enclosure.

2.4.2   Framing

  Panels shall be joined and supported by specially designed framing members
  that clamp the edges of the panels and provide continuous, uniform, and
  constant pressure for contact to connect the shielding elements of the
  panels.  The walls shall be self supporting from floor to ceiling with no
  bracing.  Deflection of walls under a static load of 335 N 75
  pounds applied normally to the wall surface at any point along the
  framing members shall not exceed 1/250 of the span between supports.  
  [Ceilings shall be self-supporting from wall to wall.] [Ceilings shall be
  supported by adjustable, nonconducting, isolated hangers from the
  structural ceiling above.]  Ceilings shall be designed to have a deflection
  under total weight, including ceiling finish, of not more than 1/270 of the
  span.  A one-piece factory pre-welded corner section or trihedral corner
  framed with a brass machine cast corner cap assembly consisting of inner
  and outer parts shall be provided at all corner intersections of walls and
  floor or ceiling.  The modular enclosure shall be designed for ease of
  erection, disassembly, and reassembly.

2.4.3   Channel

  The framing-joining system members shall consist of 3 mm 1/8 inch
  thick zinc-plated steel channels having a minimum 16 mm 5/8 inch
  overlap along each side of the contacting surface.  Screw fasteners shall
  be spaced at 75 or 100 mm 3 or 4 inch intervals.  Screw fasteners
  shall be either zinc-or cadmium-plated steel, minimum size 6 mm 1/4
  inch - 20 with a pan or flat Phillips head.  Fasteners shall be
  heat-treated and hardened with a minimum tensile strength of 931 MPa.
  135,000 psi.

2.4.4   Sound Transmission Class (STC)

  Enclosure panels shall have an STC of [30] [_____] dB minimum when tested
  according to ASTM E 90.

2.4.5   Penetration Plates (Bolted Construction)

  Plates shall be a minimum 3 mm 1/8 inch thick ASTM A 36 steel
  plate, sized [450] [_____] mm [18] [_____] inches by [450]
  [_____] mm [18] [_____] inches and shall have a 6 mm 1/4 inch
  thick extruded brass frame for mounting to the shielded enclosure wall
  panel.  Penetration plates shall extend at least 150 mm 6 inches
  beyond all penetrations.

2.5   EM SHIELDED DOORS

  **************************************************************************  
                NOTE:  Edit these paragraphs depending on type of
                door used on project.  
  **************************************************************************  
  
2.5.1   General

  Material in shielded doors and frames shall be steel conforming to ASTM A
  36, ASTM A 366 or ASTM A 568, and ASTM A 569 and shall be
  stretcher-leveled and installed free of mill scale.  Metal shall be thicker
  where indicated or required for its use and purpose.  Metal thresholds of
  the type for proper shielding at the floor shall be provided.  Fire rated
  shielded doors and assemblies shall meet NFPA 80 and NFPA 80A
  requirements and shall bear the identifying label of a nationally
  recognized testing agency qualified to perform certification programs.  The
  EM shielded doors shall be provided by a single supplier who has been
  regularly engaged in the manufacture of these items for at least the
  previous 5 years.  The assemblies shall be supplied complete with a rigid
  structural frame, hinges, latches, and parts necessary for operation.  The
  products supplied shall duplicate assemblies that have been in satisfactory
  use for at least 2 years.  The door frame shall be steel suitable for
  [welding] [bolting] to the surrounding structure and shield.  The EM
  filters, EM waveguide penetrations for door systems, and miscellaneous
  material shall be provided for a complete system.  The enclosure door shall
  be nonsagging and nonwarping.  The EM shielded door shall provide a
  shielding effectiveness of [10 dB] [20 dB] greater than the minimum EM
  shielding effectiveness requirements.  The door shall have a clear opening
  [as shown on the drawings] [of [915] [_____] mm [36] [_____] inches
  wide and [2135] [_____] mm [84] [_____] inches high].  The door and
  frame assembly shall have a sound rating of STC [30] [_____] minimum.  
  Testing shall be performed in accordance with ASTM E 90.

2.5.1.1   Door Latch

  The door latch shall be lever controlled with roller cam action requiring
  not more than 67 N 15 pounds of operating force on the lever handle
  for both opening and closing.  The door shall be equipped with a latching
  mechanism having a minimum of three latching points that provides proper
  compressive force for the EM seal.  The mechanism shall be operable from
  both sides of the door and shall have permanently lubricated ball or thrust
  bearings as required at points of pivot and rotation.

2.5.1.2   Hinges


  Doors shall be equipped with a minimum of three well-balanced adjustable
  ball-bearing or adjustable radial thrust bearing hinges suitable for equal
  weight distribution of the shielded doors.  Hinges shall allow adjustment
  in two directions.  Force necessary to move the doors shall not exceed 22
  N. 5 pounds.

2.5.1.3   Threshold Protectors

  Threshold protectors shall be furnished for each EM shielded door.
  Protectors shall consist of portable ramps that protect the threshold when
  equipment carts or other wheeled vehicles are used to move heavy items
  across the threshold.  The ramps may be asymmetrical to account for
  different floor elevations on each side, but the slope of the ramp shall
  not exceed 4:1 on either side.  Ramps shall be designed to support a
  [227] [_____] kg [500] [_____] pound vertical force applied to a
  75 by 13 mm 3 by 1/2 inch area for a personnel door, and a [907]
  [_____] kg [2,000] [_____] pound vertical force applied to a 75 by
  13 mm 3 by 1/2 inch area for an equipment double leaf door.  The
  force shall be applied to the contact area between the threshold and the
  door.  Mounting brackets, convenient to the entry, shall be provided to
  store the ramp when not in use.

2.5.1.4   Frequency of Operation

  With proper maintenance, door assemblies shall function properly through
  100,000 cycles and 15-year service life minimum without the shielding
  effectiveness decreasing below the overall shield required attenuation.

2.5.1.5   Electric Interlocking Devices

  Electric interlocking devices shall be provided for vestibules equipped
  with shielded doors at each end.  Electric interlocking devices shall be
  provided so that shielded doors at the ends of the vestibule cannot be
  opened at the same time during normal operation.  A manual override shall
  be provided to allow emergency egress, and an audible alarm shall be
  provided to indicate that doors at each end of the vestibule are open.  The
  alarm will continue to sound while both doors are open.  The Contractor
  shall provide a low-voltage piezoelectric-type alarm, in a tamperproof
  enclosure, at a location shown on the project drawings or as directed by
  the Contracting Officer's representative.  The sound intensity shall be
  45 dBA minimum at 3.05 m. 10 feet.  Lights shall be provided on the
  side of each door outside the vestibule to indicate that the other door is
  open.  Interlock systems may be integrated into a cypher lock system.  The
  interlock system shall be powered by an uninterruptible power source and
  shall be fail-safe in an unlocked condition in the event of a power
  failure.

2.5.1.6   Electric Connectivity

  Electric connectivity for sensors, alarms, and electric interlocking
  devices shall be installed in accordance with the door manufacturer's
  instructions, the approved drawings, and Section 16415 ELECTRICAL WORK,
  INTERIOR.

2.5.1.7  Threshold Alarm

  A press-at-any-point ribbon switch shall be applied to the threshold.  The
  switch shall enunciate an alarm whenever pressure is applied to the
  threshold of the EM shielded door.

2.5.1.8   Hold Open and Stop Device

  Each EM shielded door leaf shall be provided with a hold open and stop
  device permanently attached to the door leaf.  Shielded doors shall have a
  fastener plate welded onto the door.  The device shall not interfere with
  the finger stock.  No drilling or tapping of the shielded door will be
  allowed.

2.5.1.9   Emergency Exit Hardware

  Emergency exit EM shielded doors shall be equipped with single motion
  egress hardware.  The force required to latch and unlatch emergency exit
  hardware on EM shielded doors shall meet life safety code NFPA 101.  
  Field alterations or modifications to panic hardware will not be allowed.

2.5.1.10   Finish

  EM shielded doors shall be factory prime painted with zinc chromate primer.
  Doors may be factory finish painted or galvanized.  The Contractor shall
  touch up any damaged finish.

2.5.1.11   Spare Parts

  The Contractor shall furnish one set of finger stock and EM gaskets (if
  used) for each hinged EM shielded door provided.  In addition, one set of
  manufacturer recommended and Contracting Officer approved spare parts for
  EM shielded doors of each style installed shall be provided.

2.5.1.12   Tools

  The Contractor shall furnish one full set of tools that are required to
  maintain the doors and are not typically available from tool vendors.  The
  Contractor shall furnish environmentally safe lubricants, cleaning
  solvents, or coatings in sufficient quantities to last for [6] [_____]
  months.

2.5.1.13   Maintenance Supplies and Procedures

  Maintenance supplies sufficient for a [3] [_____] year period or [50,000]
  [_____] open-close cycles, whichever is greater, shall be provided for each
  EM shielded door.  The maintenance instructions required to maintain the
  door through the cycle count shall be prominently displayed nearby.

2.5.1.14   Door Counter

  A door operation counter shall be provided on the enclosure interior.

2.5.1.15   Additional Hardware

  **************************************************************************  
                NOTE:  Alarms would normally be specified in Section
                16725 INTRUSION DETECTION SYSTEM.  Hardware will be
                specified in the hardware section.  
  **************************************************************************  
  
  See door schedule on drawings and Section 08700 BUILDER'S HARDWARE,
  for additional hardware requirements.  Fire rating and STC sound ratings
  shall be as required by the door finish schedule on the drawings or in the
  specifications.

2.5.2   Latching Type Doors

  **************************************************************************  
                NOTE:  The knife edge shall be made of stainless
                steel 430 series if it will be exposed to moist air
                containing salt (near the sea coast) or in an
                uncontrolled or corrosive environment.  
  **************************************************************************  
  
  Doors shall be [steel] [laminated] type.  [Steel doors shall be a minimum
  of 3.416 mm 10 gauge thick steel sheet electrically and
  mechanically joined by welded steel frames overlapping joints with
  continuous EM welds.] [Laminated type shall be the same construction as
  enclosure panels, except the steel faces shall be electrically and
  mechanically joined by channels or overlapping seams, both of which shall
  be continuously seam welded or soldered along all joined surfaces.]  The
  closure seal shall utilize an extruded brass channel containing a recess
  into which [two] [_____] sets of [beryllium copper condition HT in
  accordance with ASTM B 194] [stainless steel 430 (magnetic type)
  series] contact fingers and a closed cell foam rubber air seal are fitted
  and can be easily removed and replaced without the use of special tools and
  without the application of solders.  The door shall mate to the frame in a
  manner that allows the insertion of a brass knife edge between the two rows
  of the radio frequency finger stock, to obtain optimum conductivity and
  electromagnetic shielding.  High-temperature silver solder shall be used to
  attach the brass knife edge components to the door panels and the frame.  
  The fingers that form a contact between the door and its frame shall be
  protected from damage due to physical contact and shall be concealed within
  the door and frame assembly.

2.5.3   Pneumatic Sealing Doors

  Pneumatic sealing mechanisms shall achieve EM shielding by using pressure
  to force the door panel against the frame surface.  Contact areas of door
  and frame shall be a peripheral strip not less than 75 mm 3 inches
  wide completely around the door with a tinned or highly conductive
  noncorrosive surface.  After the door is in a closed position, the
  pneumatic sealing mechanism shall exert pressure in not more than 10
  seconds.  The sealing mechanism release shall be actuated in not more than
  5 seconds.  Manual [override] [operation] shall not exceed a maximum of
  [155] [_____] N [35] [_____] pounds  When the door is sealed, the
  attenuation around the edges shall meet the EM shielding effectiveness
  requirements of this specification.  Swinging doors shall have a threshold
  of zinc-plated steel, not less than 9.5 mm 3/8 inch thick.  The
  door shall be provided with a pneumatic system that maintains a nominal
  sealing pressure of [240] [_____] kPa. [35] [_____] psi.  A label
  shall be attached to pneumatic doors warning against painting of the mating
  surfaces.

2.5.3.1   Door and Enclosure Design

  Doors shall be designed for long life and reliability without the use of EM
  gaskets, EM finger stock, or other sealing devices other than the direct
  metal-to-metal contact specified.  The EM sealing device shall be fail-safe
  upon loss of air pressure and shall readily allow manual opening of the
  door.  For either normal or fail-safe operation, the maximum time to reach
  the open position shall be no more than 7 seconds.  The enclosure design
  shall include provision for removing the door for routine maintenance
  without disturbing its alignment and EM sealing properties.

2.5.3.2   Control Panel

  The inside and outside of the shielded enclosure shall contain a control
  panel including the necessary opening and closing pneumatic valves.  The
  outside control panel shall also have a pressure regulator and filter.  The
  door air supply shall be capable of quick opening from inside the enclosure
  to allow escape when opening pneumatic valves fail or malfunction.

2.5.3.3   Air System for Pneumatic Sealing

  A complete air system including compressor, filter alarm, tank, lines, air
  filter, dryer, air control valves, and controls shall be provided.  Air
  tank capacity shall be sized so that the air volume and pressure are
  sufficient to operate the door through ten complete cycles after the loss
  of normal power.

2.5.4   Magnetic Sealed Door Type

  An EM seal shall be formed by a solid metal-to-metal contact around the
  periphery of the door frame.  The materials at the contact area shall be
  compatible and corrosion resistant.  The contact force for the door EM seal
  shall be provided by electromagnets.  When the electromagnet is energized,
  the door leaf shall be pulled in to ensure a solid and continuous contact
  with the door frame.  When the electromagnet is de-energized, the door leaf
  shall be free to swing.  The EM shielded doors may use electromagnets or a
  combination of permanent magnets and electromagnets.

2.5.5   Sliding Type Door

  A sliding shielded door shall be of the size and operating direction
  indicated.  Clear openings indicated on the drawings shall not require
  dismantling of any part of the door.  The door shall be manually operable
  from either side, inside or outside, with a maximum pull (force) of 155
  N 35 pounds to set the shielded door in motion.  Shielded door face
  panels and frames shall be constructed of reinforced steel suitable for
  achieving the specified attenuation.  Frames shall be constructed of steel
  shapes welded together to form a true rectangular opening.  In the sealed
  position, the shielded doors shall provide the minimum shielding
  effectiveness specified without any derating.  The doors shall be designed
  for long life and reliability and shall not use EM gaskets, EM finger
  stocks, or other sealing devices other than the specified direct
  metal-to-metal contact.  A label shall be attached to sliding doors warning
  against painting of the mating surfaces.

2.5.6   Power Operators

  Power operators shall be [pneumatic] [electric] type conforming to NFPA
  80 and the requirements specified herein.  Readily adjustable limit
  switches shall be provided to automatically stop the door in its full open
  or closed position.  All operating devices shall be suitable for the
  hazardous class, division, and group defined in NFPA 70.

2.5.6.1   Pneumatic Operators

  **************************************************************************  
                NOTE:  Designer will coordinate with the drawings to
                ensure compressed air is available at door
                locations.  
  **************************************************************************  
  
  Pneumatic operators shall be heavy-duty industrial type designed to operate
  the door at not less than 0.2 m/s 2/3 fps or more than 0.3 m/s
  1 fps with air pressure of [_____] kPa. [_____] psi.  A
  pressure regulator shall be provided if the operator is not compatible with
  available air pressure.  Dryer, filter, and filter alarm shall be provided.  
  Pneumatic piping shall be provided up to the connection with building
  compressed air, but not more than 6 m 20 feet from door jambs.  
  Operators shall have provisions for immediate emergency manual operation of
  the door in case of failure.  The operator shall open, close, start, and
  stop the door smoothly.  Control shall be [electrical, conforming to NEMA
  ICS 2 and NEMA ICS 6; enclosures shall be Type 12 (industrial use),
  Type 7 or 9 in hazardous locations, or as otherwise indicated] [pneumatic]
  [with] [pushbutton wall switches] [ceiling pull switches] [rollover floor
  treadle] [as indicated].

2.5.6.2   Electric Operators

  Electric operators shall be heavy-duty industrial type designed to operate
  the door at not less than 0.2 m/s 2/3 fps or more than 0.3 m/s.
  1 fps.  Electrical controls shall be [pushbutton wall switches]
  [ceiling pull switches] [rollover floor treadle] [as indicated].  Electric
  power operators shall be complete with an electric motor, brackets,
  controls, limit switches, magnetic reversing starter, and other accessories
  necessary.  The operator shall be designed so that the motor may be removed
  without disturbing the limit switch timing and without affecting the
  emergency operator.  The power operator shall be provided with a slipping
  clutch coupling to prevent stalling of the motor.  Operators shall have
  provisions for immediate emergency manual operation of the door in case of
  electrical failure.  Where control voltages differ from motor voltage, a
  control voltage transformer shall be provided inside as part of the
  starter.  Control voltage shall be 120 volts or less.

  a.  Motors.  Drive motors shall conform to NEMA MG 1, shall be
  high-starting torque reversible type, and shall be of sufficient output to
  move the door in either direction from any position at the required speed
  without exceeding the rated capacity.  Motors shall be suitable for
  operation on [[120] [208] [277] [480] volts, 60 Hz] [[220] [240] [380]
  volts, 50 Hz], [single] [three] phase, and shall be suitable for
  across-the-line starting.  Motors shall be designed to operate at full
  capacity over a supply voltage variation of plus or minus 10 percent of the
  motor voltage rating.

  b.  Controls.  Each door motor shall have an enclosed reversing
  across-the-line type magnetic starter with thermal overload protection,
  limit switches, and remote control switches.  The control equipment shall
  conform to NEMA ICS 2; enclosures shall conform to NEMA ICS 6, and
  shall be Type 12 (industrial use), Type 7 or 9 in hazardous locations, or
  as otherwise indicated.  Each wall control station shall be of the
  three-button type, with the controls marked and color coded:  OPEN - white;
  CLOSE - green; and STOP - red.  When the door is in motion and the stop
  control is pressed, the door shall stop instantly and remain in the stop
  position.  From the stop position, the door shall be operable in either
  direction by the open or close controls.  Controls shall be of the
  full-guarded type to prevent accidental operation.

2.5.6.3   Leading Edge Safety Shutdown

  Leading edges of the door with operators shall have a safety shutdown
  switch strip the entire length of the leading edge.  The safety strip shall
  be press-at-any-point ribbon switches.  Activation of the strip shall shut
  down the operator and release the door with reset required to continue door
  operation.

    
2.5.7   EM Shielded Door Factory Test
  **************************************************************************  
                NOTE:  When specifying nonlatching doors, delete
                door static load and sag tests and cycle test for
                door latches.  Retain cycle test for door hinges.  
  **************************************************************************  
  
  Test data shall be provided on at least one shielded door of each type
  provided for the facility to verify that the EM shielded doors of the
  design supplied have been factory tested for compliance with this
  specification.  Test doors shall not be furnished on the project.  Test
  data reports shall be submitted in accordance with paragraph SUBMITTALS.

2.5.7.1   Swinging Door Static Load Test

  The door shall be mounted and latched to its frame, then set down in a
  horizontal position such that it will open downward with only the frame
  rigidly and continuously supported from the bottom.  A load of 195
  kg/psm 40 lb/psf shall be applied uniformly over the entire surface
  of the door for at least 10 minutes.  The door will not be acceptable if
  this load causes breakage, failure, or permanent deformation which causes
  the clearance between door leaf and stops to vary more than 1.6 mm
  1/16 in from the original dimension.

2.5.7.2   Swinging Door Sag Test

  The door and its frame shall be installed normally and opened 90 degrees. 
  Two 45 kg 100 pound weights, one on each side of the door, shall be
  suspended from the door within 130 mm 5 in of the outer edge for at
  least 10 minutes.  The door will not be acceptable if this test causes
  breakage, failure, or permanent deformation which causes the clearance
  between the door leaf and door frame to vary more than 1.6 mm 1/16
  in from the original dimension.

2.5.7.3   Door Closure Test

  Each door design shall be operated 100,000 complete open-close cycles.  The
  door will not be acceptable if the closure test causes any breakage,
  failure, or permanent deformation which causes the clearance between the
  door and door frame to vary more than 1.6 mm 1/16 in from the
  original dimension.

2.5.7.4   Handle-Pull Test

  The door shall be mounted and latched to its frame.  The handle shall have
  a force of 1100 N 250 pounds applied outward (normal to the surface
  of the door) at a point within 50 mm 2 in of the end of the handle.  
  The door will not be acceptable if this test causes any breakage, failure,
  or permanent deformation exceeding 3 mm. 1/8 inch.

2.5.7.5   Door Electromagnetic Shielding Test

  The EM shielded door shall be factory tested in accordance with the
  requirements of this specification both before and after the mechanical
  tests described above.

2.6   ELECTROMAGNETIC FILTERS

  **************************************************************************  
                NOTE:  All EM filters for power and signal lines
                should be scheduled on the drawings.  
  
                This guide specification covers electromagnetic
                filters for 50, 60, and 400 Hz power lines and
                signal lines for GENERAL USE ONLY.  This
                specification is NOT applicable for filters to be
                used with a specific individual item of electronic
                equipment.  Filters for use with specific individual
                items of equipment must be scheduled on the drawings
                showing voltage, current, insertion loss, passband,
                frequency, baud rate, and cutoff frequency.  
  **************************************************************************  
  
  A filter shall be provided for each power, data, and signal line
  penetrating the enclosure.  These lines shall include, but are not limited
  to, power lines, lines to dummy loads, alarm circuits, lighting circuits,
  and signal lines such as telephone lines, antenna lines, HVAC control, and
  fire alarm.  Filters [and ESAs] shall be enclosed in metallic cases which
  shall protect the filter elements from moisture and mechanical damage.  All
  external bonding or grounding surfaces shall be free from all insulating
  protective finishes.  All exposed metallic surfaces shall be suitably
  protected against corrosion by plating, lead-alloy coating, or other means. 
  The finish shall provide good electrical contact when used on a terminal or
  as a conductor, shall have uniform texture and appearance, shall be
  adherent, and shall be free from blisters, pinholes and other defects.  The
  filter [and ESA] assemblies shall also meet the requirements of UL
  1283.  Insertion loss in the stop band between the load side of the
  filter and the power supply side shall be not less than the EM shielding
  attenuation specified herein.  The filter used for 400 Hz shall be provided
  with power factor correcting coil to limit the reactive current to 10
  percent maximum of the full load current rating.  Each filter unit shall be
  capable of being mounted individually and shall include one filter for each
  phase conductor of the power line and the neutral conductor.  The signal
  filters shall include one filter for each conductor.

2.6.1  Enclosure

  **************************************************************************  
                NOTE:  The intent of this paragraph is to preserve
                the integrity of the filter and to shield the input
                and output circuits from each other.  Usually, this
                is accomplished by mounting the filters in an
                EM-modified NEMA Type 1 enclosure with separate
                compartments for the input and the output terminals.  
                If a weatherproof or hazardous area type enclosure
                is needed, it must be specified.  
  **************************************************************************  
  
  Filter units shall be mounted in an EM modified NEMA Type [1] [_____]
  enclosure in accordance with NEMA ICS 6 and meet the requirements of
  UL 1283.  Enclosures shall be made of corrosion resistant steel of
  1.9837 mm 14 gauge minimum thickness with welded seams and
  galvanized bulkhead cover plates.  The enclosure nonconductive surfaces
  shall be finished with a corrosion-inhibiting primer and two coats of baked
  or finish enamel.  The input compartment shall house the individual line
  filters and the input terminals of the filters and mounting for the surge
  arrestor.  Live parts shall be spaced in accordance with NFPA 70.  
  Filter leads shall be copper.  Filter enclosures shall be shielding
  effectiveness tested in accordance with IEEE STD 299 and Table I of
  this specification.  [Test leads and coaxial connectors through the
  enclosure shall be provided for HEMP testing.] [The imbedded configuration
  shall be used for filter enclosures as required by MIL-STD 188 125.]

2.6.1.1   Filter Unit Mounting

  Each filter unit shall be mounted individually in an enclosure containing
  one filter for each penetrating conductor.  One end of the individual
  filter case shall be attached to the rf barrier plate between the two
  compartments to provide and rf tight seal between the rf barrier plate and
  the filter case.  The terminals of the filters shall project through
  openings in the rf barrier plate into the inner terminal compartment.  The
  case of each filter shall be attached to both the enclosure and to the
  barrier plate to prevent undue stress being applied to the rf seal between
  the filter case and the rf barrier plate.  Individual filters shall be
  removable from the enclosure.  Like filters shall be interchangeable.

2.6.1.2   Conduit Connections to Enclosures

  The load terminal and input compartments shall have no knockouts, and each
  compartment shall have weldable threaded conduit hubs.  The hubs shall be
  circumferentially EM welded in place and shall be sized and located as
  required for the conduits indicated.

2.6.1.3   Access Openings and Cover Plates

  Enclosures shall have separate clear front access cover plates on terminal
  and power input compartments.  Access cover plates shall be hinged with EM
  gaskets and 75 mm 3 inch maximum bolt spacing.  The design shall
  include thick cover plates and folded enclosure edges to prevent enclosure
  deformation, bolt spacers to prevent uneven gasket compression, and gasket
  mounting to facilitate replacement.  All gasket contact areas shall be
  tin-plated using the electrodeposited type I method in accordance with
  ASTM B 545.  Nuts and bolts shall be permanently fastened to the
  enclosure by welding or captive attachments.

2.6.1.4   Operating Temperature

  The filter and ESA assembly shall be rated for continuous operation, with
  filters at rated voltage and full-load currents, in ambient temperatures
  from minus 55 to plus 65 degrees C (measured outside the EM filter
  enclosure).  Filter components shall be suitable for continuous full load
  operation at a temperature from minus 55 to plus 85 degrees C.

2.6.1.5   Short Circuit Withstand

  Filters shall be labeled and built to have standard short circuit withstand
  ratings in accordance with UL 1283.  The minimum ratings shall be as
  follows:


                                FILTER RATED           SHORT CIRCUIT FULL LOAD
                              CURRENT, RMS AMPERE          AMPERES SYMMETRICAL

               0-100                    10,000
             101-400                    14,000

2.6.1.6   Filter Connections

  Individual filters shall have prewired standoffs and solderless lugs.  The
  lugs shall be of the hexagonal head bolt or screw type and shall conform to
  UL 486A.  Live parts shall be spaced in accordance with NFPA 70.

2.6.2   Internal Encapsulated Filters (Filter Units)

  **************************************************************************  
                NOTE:  There are two kinds of power filters,
                commonly known as "W" and "X" series.  The "W"
                series filters are designed to achieve rated
                insertion loss under load when tested in accordance
                with MIL-STD 220, which only requires testing under
                load conditions from 100 kHz to 20 MHz.  The "X"
                series device data sheets will contain the phrase
                "tested using extended range buffer networks" and
                will satisfy the stated performance under full load
                at frequencies below 100 kHz.  The "X" series
                filters will also be tested in accordance with
                MIL-STD 220.  The "X" series filters can also be
                differentiated from "W" devices by the fact that
                they are usually two to three times greater in
                weight.  
  
                Fire alarm, signal, energy monitoring and control
                system, telephone, and control lines require filters
                that pass a specific frequency, voltage, and number
                of conductors.  Fire alarm circuits with ground
                fault indicators will show a ground fault when
                connected through a filter and should be avoided.  A
                fiber optic connection through the shield is
                recommended.  Conductors penetrating the shield
                perimeter shall be kept to a minimum.  Systems
                penetrating the shield will have special
                requirements in their specifications for
                compatibility between system signal and control
                circuits and the EM filters.  
  **************************************************************************  
  
2.6.2.1   Filter Construction

  Individual filters shall be heavy-duty type sealed in a steel case.  After
  the filter is filled with an impregnating or encapsulating compound, the
  seams shall be welded.  When a solid potting compound is used to fill the
  filter, the filters may be mechanically secured and sealed with solder. 
  Hermetically sealed impregnated capacitors shall be used, or the complete
  filter assembly shall be vacuum impregnated.  Individual filter cases shall
  be fabricated of not less than 2 mm 14 gauge thick steel and
  finished with a corrosion-resistant plating,or one coat of
  corrosion-resistant primer and two coats of finish enamel.  The filter
  shall be filled with an impregnating or potting compound that is chemically
  inactive with respect to the filter unit and case.  The compound, either in
  the state of original application or as a result of having aged, shall have
  no adverse effect on the performance of the filter.  The same material
  shall be used for impregnating as is used for filling.  Filter terminals
  shall be copper that can withstand the pull requirements specified and
  measured in accordance with paragraph Terminals Pull Test.

2.6.2.2   Ratings

  **************************************************************************  
                NOTE:  Indicate maximum current, voltage, and pass
                band frequency ratings on the drawings.  If no
                drawings are furnished with the specifications,
                specify the ratings here.  
  **************************************************************************  
  
  [Filters shall be provided in the current, voltage, and frequency ratings
  indicated on the drawings.]  [Filter current shall be [_____].]  [Filter
  voltage shall be [[120] [208] [277] [480] volts, 60 Hz] [[230] [250] [400]
  volts, 50 Hz].]  [The pass band frequencies [_____] Hz to [_____] Hz shall
  be suitable for use with the [50] [_____] [60] [_____] [and] [400] [_____]
  Hz power source and signal line filters as indicated.]

2.6.2.3   Voltage Drop

  Voltage drop through the filter at operation frequency shall not exceed 2
  percent of the rated line voltage when the filter is fully loaded with a
  resistive load (unity power factor.  Voltage drop measurements shall be in
  accordance with paragraph Voltage Drop Measurements.

2.6.2.4   Input Elements

  Filters shall be provided with inductive inputs.  If inductive input is
  used then an ESA is required to protect the filter.  The inductor shall
  ensure firing potential for the preceding ESA and shall limit the current
  through the filter capacitor.  The input inductor shall be designed to
  withstand at least a 10,000-volt transient.

2.6.2.5   Drainage of Stored Charge

  Filters shall be provided with bleeder resistors to drain the stored charge
  from the capacitors when power is shut off.  Drainage of stored charge
  shall be in accordance with NFPA 70.

2.6.2.6   Insertion Loss

  **************************************************************************  
                NOTE:  Use 100 dB insertion loss at 14 kHz to 10 GHz
                for applications such as secure communications
                installations.  For other applications, insert
                appropriate insertion loss and frequency range for
                the specific product.  Consult filter manufacturer
                for detailed requirements.  Also consult the
                manufacturer when leakage current is important, such
                as in life safety areas.  There is a tradeoff
                between leakage current and insertion loss when
                insertion loss is measured according to MIL-STD 220
                because of the test connection and the
                line-to-ground capacitance.  Harmonic loading of EM
                filters will require alterations to the electrical
                system design to protect the filters from damage.  
                Large individual loads, such as adjustable speed
                drive and uninterruptible power supplies, should
                have shielded isolation transformers on their input
                line side.  Multiple small individual loads, such as
                computers, should have EM filters derated or
                shielded isolation transformers between filter
                output and the harmonic generating loads.  EM
                filters should be derated by 50 percent when serving
                loads with substantial harmonic components.  If a
                facility is formally required to fully comply with
                MIL-STD 188 125, filter and ESA characteristics
                should meet the standard's requirements as applied
                to the facility.  The facility's electrical system
                should be designed to meet the requirements of
                MIL-STD 188 125 with commercially available filters
                and ESA.  The commercial electrical power feeder
                should be arranged in a manner that will meet
                MIL-STD 188 125 requirements.  Voice and data lines
                should be converted to fiber optics prior to
                penetration of the EM shield.  The requirements of
                MIL-STD 188 125 should be applied by a shielding
                specialist experienced in the standard's
                requirements and applications.  
  **************************************************************************  
  
  Insertion loss shall meet or exceed the levels complying with EM shielding
  effectiveness attenuation requirements herein when measured in accordance
  with MIL-STD 220.  Insertion loss measurements shall be performed in
  accordance with MIL-STD 220 and the paragraph Insertion Loss
  Measurement.

2.6.2.7   Operating Temperature Range

  Individual filters mounted in the filter enclosure operating at full load
  amperage and rated voltage shall not exceed plus 85 degrees C based on an
  ambient temperature of 65 degrees C outside the filter enclosure.
  Continuous operation from minus 55 to plus 85 degrees C shall be
  demonstrated according to paragraph "Filter Life Test (at Elevated Ambient
  Temperature)".  Filters shall also withstand temperature cycling as
  specified in paragraph "Thermal Shock Test".  The filter shall remain at
  rated voltage and full-load current until temperature equilibrium is
  reached or 24 hours, whichever is greater.

2.6.2.8   Current Overload Capability

  Filters shall be capable of operating at 140 percent of rated current for
  15 minutes, 200 percent of rated current for 1 minute, and 500 percent of
  rated current for 1 second when tested in accordance with paragraph
  Overload Test.

2.9.2.9   Reactive Shunt Current

  The reactive shunt current drawn by the filter operating at rated voltage
  shall not exceed 30 percent of the rated full-load current when measured in
  accordance with paragraph Reactive Shunt Current Measurements.

2.6.2.10   Dielectric Withstand Voltage

  Filters shall be provided which conform to the minimum values of dielectric
  withstanding voltage.  Filter dielectric withstand voltage test shall be in
  accordance with paragraph "Dielectric Withstand Voltage Test".  HEMP
  filters shall be capable of operating continuously at full-rated voltage
  and of withstanding an overvoltage test of 2.8 times the rated voltage for
  1 minute.  In addition, each filter shall be capable of withstanding a
  20-kV or 4-kA peak transient pulse of approximately 20 ns pulsewidth at
  full operating voltage, without damage.

2.6.2.11   Insulation Resistance

  The insulation resistance between each filter terminal and ground shall be
  greater than 1 megohm when tested in accordance with paragraph Insulation
  Resistance Test.

2.6.2.12   Parallel Filters (Current Sharing)

  Where two or more individual filters are electrically tied in parallel to
  form a larger filter, they shall equally share the current.  Equally
  sharing is defined to be within 5 percent of the average current.  The
  tests shall be in accordance with paragraph Current Sharing.

2.6.2.13   Harmonic Distortion

  Harmonics generated by the insertion of a filter shall not increase line
  voltage distortion more than 2.5 percent when measured with a unity power
  factor in accordance with the paragraph Harmonic Distortion Test.

2.6.3   Marking of Filter Units

  Each filter case shall be marked with HCI tags and with the rated current,
  rated voltage, manufacturer s name, type of impregnating or potting
  compound, operating frequency, and model number.  In addition, individual
  filter cases, the filter enclosures, and supply and load panelboards of
  filtered circuits shall be marked by the manufacturer with the following:

  "WARNING:  Before working on filters, terminals must be temporarily
  grounded to ensure discharge of capacitors."  Nameplates and warning labels

  shall be securely attached.  Nameplates and warning labels shall be
  attached with epoxy.

2.6.4   Minimum Life

  Filter assemblies shall be designed for a minimum service life of 15 years.

2.6.5   Power and Signal Line Factory Testing

  **************************************************************************  
                NOTE:  In most cases, test results for equal filters
                are sufficient to determine compliance with
                specification requirements.  Factory tests on
                individual filters may be required for higher than
                average temperature applications, special filter
                configurations, and other special project
                requirements.  
  
                Filters with nonstandard configuration or ratings
                may require testing by an independent testing
                organization.  These ratings would be for filters
                above 1,000 amperes.  
  **************************************************************************  
  
  Factory test report data shall be submitted for each filter configuration,
  voltage, and amperage which shall show the ability of filters to meet the
  specified requirements.  Filter test reports shall be based on prior tests
  of the same filter assembly design and components.  Test data reports shall
  be submitted in accordance with paragraph SUBMITTALS.  Test data shall
  include the following:

  a.  Voltage Drop Measurements.

  b.  Insertion Loss Measurements.

  c.  Filter Life Test.

  d.  Thermal Shock Test.

  e.  Overload Test.

  f.  Reactive Shunt Current Measurements.

  g.  Dielectric Withstand Voltage.

  h.  Insulation Resistance Test.

  i.  Current Sharing.

  j.  Harmonic Distortion.

  k.  Terminals.

2.6.5.1   Voltage Drop Measurements

  The voltage drop measurements on both ac and dc filters shall be performed
  with the components mounted in the filter/ESA assembly enclosure or mounted
  on a metal plate by the same holding method that will be used for mounting
  in the enclosure.  For ac rated filters, measurements shall be made by
  using expanded scale-type meters.  For dc rated filters, measurements shall
  be made by using a dc meter when the filter is carrying rated current and
  rated voltage.

2.6.5.2   Insertion Loss Measurements

  Insertion loss measurements for power filters shall have the following
  modifications.  The filters shall be installed in the filter/ESA assembly
  enclosure.  The load current power supply shall operate at the rated
  voltage of the filters and shall be capable of providing any current from
  no-load through rated full-load current.  The rf signal generator shall be
  a swept continuous wave (cw) source.  The buffer networks shall be modified
  to permit valid measurements over the entire frequency band on which
  insertion loss requirements are specified (14 kHz-1 Ghz).  The receiver or

  network analyzer shall be capable of operating over the entire frequency
  band on which insertion loss requirements are specified (14 kHz-1 Ghz).
  Sensitivity shall be adequate to provide a measurement dynamic range at
  least 10 dB greater than the insertion loss requirement.  The load
  impedance shall be resistive and shall be capable of dissipating the rated
  full-load filter current.  Insertion loss measurements shall be made at 20
  percent, 50 percent, and 100 percent of the filter full-load operating
  current.  Insertion loss measurements for communication/signal line filters
  shall be performed the same as for power filters except that the insertion
  loss measurements are required at a load impedance equal to the image
  impedance of the filter.  No load insertion loss measurements shall be
  performed over the frequencies defined in the EM shielding effectiveness
  attenuation requirements for both power and communication filters. [Testing
  shall be load to source for TEMPEST.]  [Testing shall be source to load for
  HEMP.]

2.6.5.3   Filter Life Test (at Elevated Ambient Temperature)

  This test is conducted for the purpose of determining the effects on
  electrical and mechanical characteristics of a filter, resulting from
  exposure of the filter to an elevated ambient temperature for a specified
  length of time, while the filter is performing its operational function.
  Surge current, total resistance, dielectric strength, insulation
  resistance, and capacitance are types of measurements that would show the
  deleterious effects due to exposure to elevated ambient temperatures.  A
  suitable test chamber shall be used which will maintain the temperature at
  the required test temperature and tolerance.  Temperature measurements
  shall be made within a specified number of unobstructed inches from any one
  filter or group of like filters under test.  This test shall be made in
  still air.  Specimens shall be mounted by their normal mounting means.  
  When groups of filters are to be tested simultaneously, the mounting
  distance between filters shall be as specified for the individual groups
  otherwise the mounting distance shall be sufficient to minimize the
  temperature on one filter affecting the temperature of another.  Filters
  fabricated of different materials shall not be tested simultaneously.  The
  test temperature shall be 85 + 2 degrees C.  The length of the test shall
  be for 5,000 hours.  Specified measurements shall be made prior to, during,
  or after exposure.

2.6.5.4   Thermal Shock Test

  This test is conducted for the purpose of determining the resistance of a
  filter to exposures at extremes of high and low temperatures, and to the
  shock of alternate exposures to these extremes.  Suitable temperature
  controlled systems shall be used to meet the temperature requirements and
  test conditions.  Environmental chambers shall be used to meet test
  requirements and to reach specified temperature conditions.  Filters shall

  be placed so that there is no obstruction to the flow of air across and
  around the filter.  The filter shall be subjected to the specified test
  condition.  The first five cycles shall be run continuously.  After five
  cycles, the test may be interrupted after the completion of any full cycle,
  and the filter allowed to return to room ambient temperature before testing
  is resumed.  One cycle consists of steps 1 through 4 of the applicable test
  condition for dual environmental test chambers (one low temperature and one
  high temperature test chamber) and steps 1 and 3 for single compartment
  test chambers where both high and low temperatures are achieved without
  moving the filter.  The test conditions are as follows:

  1.  -55 deg C. + 0 deg and -3 deg
  2.  25 deg C. +10 deg and -5 deg
  3.  85 deg C. + 3 deg and -0 deg
  4.  25 deg C. +10 deg and -5 deg

  The effective total transfer time from the specified low temperature to the
  specified high temperature shall not exceed 5 minutes.  The exposure time
  in air at the extreme temperatures is a function of the weight of the
  filter.  The minimum exposure time per the weight of the filter shall be as
  follows:

  a.  1 oz. and below 15 minutes

  b.  Above 1 oz. to 4.8 oz.  30 minutes

  c.  Above 4.8 oz. to 3 lb.  1 hour

  d.  Above 3 lb. to 30 lb.  2 hour

  e.  Above 30 lb. to 300 lb.  4 hour

  f.  Above 300 lb.  8 hour

  Specified measurements shall be made prior to the first cycle and upon
  completion of the final cycle, except that failures shall be based on
  measurements made after the specimen has stabilized at room temperature
  following the final cycle.

2.6.5.5   Overload Test

  Filters shall be mounted in the filter/ESA assembly enclosure or mounted on
  a metal plate by the same holding method that will be used for mounting in
  the enclosure.  A specified current shall then be applied for a specified
  period of time.  After the filter has returned to room temperature, the
  insulation resistance and voltage drop shall be measured.  The insulation
  resistance shall be measured using the method in paragraph "Insulation
  Resistance Test".  AC voltage drop measurements shall be made by using
  expanded scale-type meters which will enable voltage differences of less
  than 1 volt to be read.  DC voltage drop measurements shall be made by
  using a dc reading meter when the filter is carrying rated current and
  rated voltage.  The insulation resistance and the voltage drop shall be
  measured after each separate overload test.  Filters will also be visually
  examined for evidence of physical damage after each test.

2.6.5.6   Reactive Shunt Current Measurements

  The reactive shunt current measurements shall be performed with the filters
  mounted in the filter/ESA assembly enclosure or mounted on a metal plate by
  the same holding method that will be used for mounting in the enclosure.
  The filter shall be terminated in the inner compartment in an open circuit.
  Rated ac voltage shall be applied between the filter outer compartment
  terminal and the enclosure or metal plate.  The ac current into the outer
  compartment terminal shall be monitored.  The measured current is equal to
  the filter reactive shunt current.

2.6.5.7   Dielectric Withstand Voltage Test

  The dielectric withstanding voltage test (also called high-potential, over
  potential, voltage-breakdown, or dielectric-strength test) consists of the
  application of a voltage higher than rated voltage for a specific time
  between mutually insulated portions of a filter or between insulated
  portions and ground.  Repeated application of the test voltage on the same
  filter is not recommended as even an overpotential less than the breakdown
  voltage may injure the insulation.  When subsequent application of the test
  potential is specified in the test routine, succeeding tests shall be made
  at reduced potential.  When an alternating potential (ac) is used, the test
  voltage shall be 60 Hz. and shall approximate a true sine wave in form.  
  All ac potentials shall be expressed as root-mean-square values.  The KVA
  rating and impedance of the source shall be such as to permit operation at
  all testing loads without serious distortion of the waveform and without
  serious change in voltage for any setting.  When a direct potential (dc) is
  used, the ripple content shall not exceed 5 percent rms of the test
  potential.  A voltmeter shall be used to measure the applied voltage to an
  accuracy of 5 percent.  When a transformer is used as a high-voltage source
  of ac, a voltmeter shall be connected across the primary side or across a
  tertiary winding provided that the actual voltage across the filter will be
  within the allowable tolerance under any normal load condition.  Unless
  otherwise specified, the test voltage shall be dc and shall be as follows:

  a.  DC rated only - 2.5 times rated voltage.

  b.  For filters with ac and dc ratings - 2.5 times rated dc voltage.

  c.  AC rated only - 4.2 times rated rms voltage.

  The duration of the dc test voltages shall be 5 seconds minimum, 1 minute
  maximum, after the filter has reached thermal stability at maximum
  operating temperature produced by passage of rated current.  The test
  voltage shall be applied between the case (ground) and all live (not
  grounded) terminals of the same circuit connected together.  The test
  voltage shall be raised from zero to the specified value as uniformly as
  possible, at a rate of approximately 500 volts (rms or dc) per second.  
  Upon completion of the test, the test voltage shall be gradually reduced to
  avoid voltage surges.  The changing current shall be 50 mA maximum.  During
  the dielectric withstanding voltage test, the fault indicator shall be
  monitored for evidence of disruptive discharge and leakage current.  The
  sensitivity of the breakdown test equipment shall be sufficient to indicate
  breakdown when at least 0.5 mA of leakage current flows through the filter
  under test.  The test shall be performed with the components mounted in the
  filter/ESA assembly enclosure.  Filters for ac circuits shall be tested
  with an ac source while filters for dc circuits shall be tested with a dc
  source.  After the test the filter shall be examined and measurements shall
  be performed to include insulation resistance measurements to determine the
  effect of the dielectric withstanding voltage test on specific operating
  characteristics.

2.6.5.8   Insulation Resistance Test

  This is a test to measure the resistance offered by the insulating members
  of a filter to an impressed direct voltage tending to produce a leakage
  current through or on the surface of these filters.  Insulation-resistance
  measurements shall be made on an apparatus suitable for the characteristics
  of the filter to be measured such as a megohm bridge, megohm-meter,
  insulation-resistance test set, or other suitable apparatus.  The test
  shall be performed with the components mounted in the filter/ESA assembly
  enclosure or mounted on a metal plate by the same holding method that will
  be used for mounting in the enclosure.  The bleeder resistor shall be
  disconnected.  The direct potential applied to the specimen shall be the
  largest test condition voltage (100, 500, or 1,000 volts +10%) that does
  not exceed the rated peak ac voltage or the rated dc voltage.  A separate
  dc power supply may be used to charge the filters to the test voltage.  The
  measurement error at the insulation-resistance value required shall not
  exceed 10 percent.  Proper guarding techniques shall be used to prevent
  erroneous readings due to leakage along undesired paths.  
  Insulation-resistance measurements shall be made between the mutually
  insulated points or between insulated points and ground.  The insulation
  resistance value shall be read with a megohmmeter and recorded after the
  reading has stabilized.  When more than one measurement is specified,
  subsequent measurements of insulation resistance shall be made using the
  same polarity as the initial measurements.

2.6.5.9   Current Sharing

  Testing shall be performed with the filters mounted in the filter/ESA
  assembly enclosure or mounted on a metal plate by the same holding method
  that will be used for mounting in the enclosure.  The filter inner
  compartment terminals shall be loaded with a resistor equal in value to the
  rated operating voltage divided by the sum of the current ratings of the
  devices in parallel.  The resistor shall be capable of dissipating the
  total current.  Rated operating voltage shall be applied at the filter
  outer compartment terminals.  The current into each filter outer
  compartment terminal shall be monitored.

2.6.5.10   Harmonic Distortion Test

  Harmonic distortion measurements shall be made using a spectrum analyzer
  having a dynamic range of [70 dB] [_____] and a frequency range from [10
  kHz to 1.7 GHz] [_____].  Total harmonic distortion shall be measured at
  the input and output terminals of the filter when operating at 25, 50, and
  100 percent of rated full-load current.

2.6.5.11   Terminals Pull Test

  The purpose of this test is to determine whether the design of the filter
  terminals can withstand the mechanical stresses to which they will be
  subjected during installation or disassembly in equipment.  Testing shall
  be performed with the components mounted in the filter/ESA assembly
  enclosure or mounted on a plate by the same holding method that will be
  used for mounting in the enclosure.  The force applied to the terminal
  shall be 89 N 20 pounds.  The point of application of the force and
  the force applied shall be in the direction of the axes of the
  terminations.  The force shall be applied gradually to the terminal and
  then maintained for a period of 5 to 10 seconds.  The terminals shall be
  checked before and after the pull test for poor workmanship, faulty
  designs, inadequate methods of attaching of the terminals to the body of
  the part, broken seals, cracking of the materials surrounding the
  terminals, and the changes in electrical characteristics such as shorted or
  interrupted circuits.  Measurements are to be made before and after the
  test.

2.7   ELECTRICAL SURGE ARRESTERS (ESA)

  **************************************************************************  
                NOTE:  ESA application guidance is found in MIL-HDBK
                423.  
  **************************************************************************  
  
2.7.1  Power and Signal Line ESA

2.7.1.1   ESA General

  ESAs shall be metal oxide varistors (MOVs) or spark gaps.  When a spark gap
  is specified, the ESA shall be enclosed within a metal case. Discharges
  shall be contained within the case; no external corona or arcing will be
  permitted.  ESAs shall be factory installed with minimum lead lengths
  within the outer compartment.  For all power filter/ESA assemblies, the
  ESAs shall be installed a minimum of 7.6 cm 3 in apart, with
  terminals at least 7.6 cm 3 in from a grounded surface.  For
  telephone filter/ESA assemblies, the ESAs shall have a minimum clearance
  spacing of 2.5 cm 1 in, and terminals shall be at least 7.6 cm
  3 in from a grounded surface.  Each phase, neutral and telephone
  circuit conductor shall be connected through an ESA to the ground bus.  The
  ESA shall be installed [in the power input compartment of the filter] [in a
  separate EM shielded enclosure].  ESA units within the filter/ESA assembly
  shall be individually replaceable.  Like ESAs shall be interchangeable.  
  ESA terminals shall withstand the 89 N 20 lb pull test.  Live parts
  shall be spaced in accordance with NFPA 70.  ESA leads shall be copper.
  Individual ESAs shall be marked with HCI tags and shall be marked with the
  manufacturer's name or trademark and part number.  The ESA shall meet the
  requirements of IEEE C62.11, IEEE C62.41, and UL 1449.

2.7.1.2    Wiring

  **************************************************************************  *
                NOTE:  Some designers prefer coiling the wire
                between the ESA and the filter, because it creates
                enough inductance to develop the ESA firing
                potential during transients for HEMP applications.  
                Short leads, as recommended herein, improve the
                voltage-limiting effectiveness of the ESA.  Fusing
                of the ESA is not recommended because protection may
                be lost without the operator's knowledge.  If fusing
                is necessary, a light to indicate a blown fuse will
                be provided on the ESA enclosures.  
  **************************************************************************  
  
  The ESAs shall be located so that leads of minimum length connect the ESA
  ground terminal to the enclosure.  The total lead length connecting the ESA
  to the filter and the ESA ground terminal to the enclosure shall be less
  than 300 mm. 12 in.  Power line ESA wiring shall be No. 4 AWG
  minimum.  Communication/signal line ESA wiring shall be of the same or
  heavier gauge than the communication/signal line conductor.

2.7.1.3   Voltage Characteristics

  **************************************************************************  
                NOTE:  Clamping voltage requirement is intended to
                ensure that the ESA does not have excessive series
                resistance.  The specific value should be chosen
                after reviewing manufacturer's data.  
  
                Specified dc breakdown voltage (or MOV voltage at 1
                milliampere dc current) for dc and single phase ac
                power should be in the range of 150 to 200 percent
                of the peak (not rms) operating voltage.  Use 200 to
                250 percent on three-phase circuits, so that a
                short-circuit fault in one phase will not fire ESA
                on the other two phases.  
  
                The spark gap dc breakdown voltage requirement is
                intended to ensure that the spark gap is a
                low-inductance, fast device.  The precise values are
                not critical and should be chosen after reviewing
                ESA catalog information.  
  **************************************************************************  
  
  Measurements of (MOV) voltage at 1 mA dc current and spark gap dc breakdown
  voltage shall be made in accordance with the following procedure.  Testing
  shall be performed with the ESAs mounted in the filter/ESA assembly
  enclosure or mounted on a metal plate by the same holding method which will
  be used for mounting in the enclosure.  A variable dc power supply shall be
  connected between the ESA terminal and the enclosure (or plate).  The
  applied dc voltage shall be increased at the rate not to exceed 10 percent
  of the rated firing voltage per second.  The (MOV) voltage at 1 mA dc
  current is the power supply output voltage, when the output current is 1
  milliampere.  The spark gap dc breakdown voltage is the applied voltage
  just prior to breakdown (indicated by a rapid decrease in the voltage
  across the device).  Deenergize the power supply immediately after the
  value has been recorded.  MOV direct current breakdown voltage at 1
  milliampere dc current shall be at least [340] [500] [1,000] [_____] volts
  and less than [425] [1,500] [_____] volts.  MOV testing shall be in
  accordance with IEEE C62.33.  Spark gap direct current breakdown
  (sparkover) voltage shall be at least [500] [1,000] [_____] volts and less
  than [1,500] [3,000] [_____] volts.  Spark gap impulse sparkover voltage of
  the ESA shall be less than 4,000 volts.  This voltage shall be on surges of
  either polarity having a rate of rise of 1,000 volts/nanosecond.  Testing
  of the ESA impulse sparkover voltage shall be performed with the spark gaps
  mounted in the filter/ESA assembly enclosure or mounted on a metal plate by
  the same holding method which will be used for mounting in the enclosure.  
  The pulse generator shall be connected between the spark gap terminal and
  the enclosure (or plate) with a minimum inductance connection.  The pulse
  generator shall be capable of providing a ramp voltage of 1 kV/ns to a peak
  voltage which is at least twice the open circuit impulse sparkover voltage.  
  Voltage across the spark gap shall be monitored on an oscilloscope or
  transient digitizing recorder, capable of at least 1 ns resolution.  The
  peak transient voltage during the pulse is the impulse sparkover voltage.  
  Response time shall be less than 4 nanoseconds.  Clamping voltage of the
  ESA shall be less than [900] [_____] volts at a current pulse of 10 kA.  
  ESA clamping voltage measurements shall be performed with the ESAs mounted
  in the filter/ESA assembly enclosure or mounted on a metal plate by the
  same holding method which will be used for mounting in the enclosure.  The
  pulse generator shall be connected between the ESA terminal and the
  enclosure (or plate) with a minimum inductance connection.  The pulse
  generator shall be capable of providing a 10 kA current pulse, on an 8- x
  20-microsecond waveshape into the ESA.  Current through the ESA and voltage
  across the ESA shall be monitored on oscilloscopes or transient digitizing
  recorders.  The asymptotic voltage during the 10 kA portion of the pulse is
  the clamping voltage.

2.7.1.4   ESA Extinguishing Characteristics

  The ESA shall extinguish and be self-restoring to the normal nonconductive
  state within one-half cycle at the operating frequency.  The ESA
  extinguishing test shall be performed with the ESA mounted in the
  filter/ESA assembly enclosure or mounted on a metal plate by the same
  holding method which will be used for mounting in the enclosure.  The
  extinguishing test shall use an ac power source connected between the ESA
  terminal and ground which shall be at the rated voltage and frequency
  capable of providing at least 25 amperes into a short-circuit load.  A
  pulse generator capable of providing a short pulse which will fire the ESA
  shall also be connected across the ESA.  Voltage across the ESA shall be
  monitored on an oscilloscope or transient digitizing recorder.  A series of
  ten pulses shall be injected.  Performance of the ESA is satisfactory if
  the arc extinguishes (indicated by re-occurrence of the sinusoidal
  waveform) within 8.5 milliseconds after the start of each pulse.

2.7.1.5   ESA Extreme Duty Discharge Current

  The ESA shall be rated to survive the extreme duty discharge current of a
  single 8- x 20-microsecond pulse with a 10 to 90 percent rise time of 8
  microseconds and fall time to a value of 36.8 percent of peak in 20
  microseconds.  The ESA for high voltage power lines (above 600 volts) shall
  have an extreme duty discharge capability equal to or greater than 70 kA.
  The ESA for low voltage power lines (below 600 volts) to such things as
  building interiors, area lighting, and external HVAC equipment shall have
  an extreme duty discharge capability equal to or greater than 50 kA.  The
  ESAs for control circuits such as interior alarms, indicator lights, door
  access controllers, HVAC controls, and telephones, shall have an extreme
  duty discharge capability equal to or greater than 10 kA.  The ESA extreme
  duty discharge test shall be performed with the ESA mounted in the
  filter/ESA assembly enclosure or mounted on a metal plate by the same
  holding method which will be used for mounting in the enclosure.  A pulse
  generator shall be connected between the ESA terminal and the enclosure (or
  plate) with a minimum inductance connection.  The pulse generator shall be
  capable of supplying an 8- x 20-microsecond waveshape and a only single
  pulse is required.  Current through the ESA and voltage across the ESA
  shall be monitored on oscilloscopes or transient digitizing recorders.  The
  ESA shall be visually monitored during the test and after the pulse
  inspected for charring, cracks, or other signs of degradation or damage.
  Test shall be on a prototype only.  The dc breakdown voltage test shall be
  repeated.

2.7.1.6  Minimum Operating Life

  **************************************************************************  
                NOTE:  Surge life test will be performed only when
                required by the user.  Coordinate current amplitude
                with manufacturer.  
  **************************************************************************  
  
  The ESA operating life tests shall be performed with the ESA mounted in the
  filter/ESA assembly enclosure or mounted on a metal plate by the same
  holding method which will be used for mounting in the enclosure.  A pulse
  generator shall be connected between the ESA terminal and the enclosure (or
  plate) with a minimum inductance connection.  The pulse generator shall be
  capable of supplying repetitive 4 kA current pulses, with a 50 ns x 500 ns
  waveshape, to the ESA.  A series of ten pulses is required.  Current
  through the ESA and voltage across the ESA shall be monitored on
  oscilloscopes or transient digitizing recorders.  The ESA shall be visually
  monitored during the series of pulses for indications of external
  breakdown.  The ESA shall be able to conduct 2,000 pulses at a peak current
  of 4 kA and 50 nanoseconds x 500 nanoseconds waveform.  Post-test shall
  include inspection for charring, cracks, or signs of degradation.  The dc
  breakdown voltage test shall be repeated.

2.7.1.7   Operating Temperature

  The ESA shall be rated for continuous operation in ambient temperatures
  from minus 25 to plus 125 degrees C.

2.7.2   ESA Testing

  ESA factory test data shall be submitted which shall show the ability to
  meet the requirements herein, based on prior tests of the same ESA assembly
  components and design.  Testing shall be performed with the ESA mounted in
  the filter/ESA assembly enclosure or mounted on a metal plate by the same
  holding method which will be used for mounting in the enclosure.  The pulse
  generator shall be connected between the ESA terminal and the enclosure (or
  plate) with a minimum inductance connection.  Current through the ESA and
  voltage across the ESA shall be monitored on oscilloscopes or transient
  digitizing recorders.  Test data shall include the following:

  a.  Breakdown Voltage.

  b.  Impulse Sparkover Voltage.

  c.  Clamping Voltage.

  d.  Extinguishing.

  e.  Extreme Duty Discharge.

  f.  Surge Life.

2.8   WAVEGUIDE ASSEMBLIES

  Waveguide-below-cutoff (WBC) protection shall be provided for all piping,
  ventilation, fiber optic cable penetrations and microwave communications
  barrier penetrations of the HEMP electromagnetic barrier.  These WBC
  penetrations shall be protected with cutoff frequencies and attenuation no
  less than the EM shielding effectiveness values listed herein.  The cutoff
  frequencies shall be no less than 1.5 times the highest frequency of the
  shielding effectiveness.  For 1 GHz, the maximum rectangular linear
  diagonal dimension shall be 10 cm 4 inches and the maximum circular
  diameter shall be 10 cm. 4 inches.  The length-to-cell
  cross-section dimension ratio of the waveguide shall be a minimum of [5:1
  to attain 100 dB] [3:1 to attain 50 dB].  Penetration locations shall be
  arranged to facilitate installation and testing by minimizing the number of
  locations.  Waveguides of each assembly type shall be factory tested in
  accordance with IEEE STD 299 and Table I of this specification.

2.8.1   Waveguide-Type Air Vents

  **************************************************************************  
                NOTE:  Occurrence of dissimilar metals will use
                corrosion resistant design.  
  **************************************************************************  
  
  Each ventilation WBC array shall be a honeycomb-type air vent with a core
  fabricated of corrosion resistant steel as shown on the drawings.  
  Waveguide construction shall include heavy frames to dissipate the heat of
  welding to the shield.  A welded WBC array shall be constructed from sheet
  metal or square tubes.  Array cells shall be formed by welding the sheets
  at intersections or welding adjacent tubes along the entire length of the
  WBC section.  The maximum cell size shall be 10 cm 4 in on a
  diagonal.  The length of the WBC section shall be at least five times the
  diagonal dimension of the cells.  Air vents shall be a permanent part of
  the shielded enclosure and shall have a shielding effectiveness equal to
  that of the total enclosure.  Static pressure drop through the vents shall
  not exceed 3.4 gpscm 0.01 inch of water at an air velocity of 305
  m/s. 1000 fpm.  Waveguides for air vents (honeycomb) shall have
  access doors in duct work for maintenance.  The frame of the honeycomb
  panel shall be [welded] [bolted] into the penetration plate [with
  continuous circumferential EM welds.] [with bolts 75 mm 3 inches on
  center.]  Welds for fabrication and installation of honeycomb waveguide
  panels are primary shield welds and shall be inspected as indicated.  
  Acceptance testing of all honeycomb panels shall be included with the final
  acceptance test.  No conductors, such as wires and louver operating rods,
  shall pass through the waveguide openings.

2.8.2   Piping Penetrations

  All piping penetrations of the HEMP barrier to include utility piping, fire
  mains, vent pipes, and generator and boiler exhausts shall be made with
  piping WBC sections.  The WBC material shall be steel with a composition
  suitable for welding to the HEMP shield.  The minimum wall thickness shall
  be 3.2 mm. 0.125 in.  The maximum inside diameter shall be 10
  cm 4 in or a metallic honeycomb insert with a maximum cell dimension
  of 10 cm 4 in shall be installed.  The WBC section shall have an
  unbroken length of at least five diameters to form a minimum cutoff
  frequency of 1.5 times the highest frequency of the shield effectiveness.  
  The piping WBC section shall be circumferentially welded or brazed  to the
  HEMP shield, pipe sleeve or a penetration plate as shown on the drawings.  
  Generator and boiler exhausts shall be constructed as shown in the drawings
  and shall be configured as a WBC or WBC array.  The circumferential
  penetration welds are primary shield welds and shall be inspected and
  tested as indicated.

2.8.3   Waveguide Penetrations

  Waveguide penetrations for dielectric fibers or hoses shall be implemented
  in the same manner as piping penetrations.  Dielectric hoses or pipes shall
  be converted to metal waveguide piping before penetrating the shield.  No
  conductors, such as wires and fiber cable strength members, shall pass
  through the waveguide opening.

2.9   GROUNDING STUD

  **************************************************************************  *
                NOTE:  Grounding stud will be provided only for
                small (under 100 square meters (1,000 square feet)
                of floor area) bolted and welded enclosures.  
  **************************************************************************  
  
  Enclosure shall have 13 mm 1/2 inch diameter stud circumferentially
  welded to each side of the shielding penetration plate. 

2.10   PENETRATION PLATES

  Penetration plates shall be minimum 6 mm 1/4 inch thick and sized
  as shown on the drawings.  The penetration plate shall overlap the shield
  penetration cutout dimension by a minimum of 150 mm 6 in on each
  side.  The penetration plate shall be [welded] [bolted] to the HEMP shield
  [with continuous circumferential EM welds.] [with bolts 75 mm 3 in
  on center.]

2.11   GALVANIZING

  Galvanizing, when practical and not otherwise indicated, shall be
  hot-dipped processed after fabrication.  Galvanizing shall be in accordance
  with ASTM A 123, or ASTM A 653, as applicable.  Exposed fastenings
  shall be galvanically compatible material.  Electrolytic couples and
  dissimilar metals that tend to seize or gall shall be avoided. 

2.12   EM SHIELDED CABINETS AND PULL BOXES

  Cabinets and pull boxes shall be modified NEMA [1] [_____] in accordance
  with NEMA ICS 6 made of corrosion resistant steel of not less than
  1.9837 mm 14 gauge thick with welded seams and galvanized bulkhead
  cover plates.  Access cover plates shall be hinged with EM gaskets and 75
  mm 3 inch maximum bolt spacing.  Design shall include thick cover
  plates, folded enclosure edges, and bolt spacers to prevent uneven gasket
  compression and enclosure deformation.  Gasket shall be easy to replace.  
  Gasket contact areas shall be tin-plated using the electrodeposited type I
  method in accordance with ASTM B 545.  Conduit hub shall be
  circumferentially EM welded to the enclosure.  The cabinets shall be
  finished with a corrosion-inhibiting primer and two coats of baked or
  finish enamel.  Cabinets shall be provided with mounting brackets for wall
  mounting or legs for floor mounting.  Cabinets and boxes of each type shall
  be factory tested in accordance with IEEE STD 299 and Table I of this
  specification.

2.13   QUALITATIVE MONITORING SYSTEM

  A built-in shield monitoring system for SELDS testing shall be provided.
  The system shall consist of either multiple injection points or a surface
  loop system.  Driving conductors shall be brought to a single lockable EM
  shielded connection box, located outside the shield in a controlled space.

PART 3   EXECUTION

3.1   INSTALLATION

3.1.1   Coordination

  The EM shielding installer shall instruct other trades in the presence and
  with the direction of the Government representative, in advance of the EM
  shielding system installation, to ensure that all individuals are aware of
  the critical installation requirements.  Cleaners, solvents, coatings,
  finishes, physical barriers, and door threshold protectors shall be
  provided as required to protect the shielding system from corrosion,
  damage, and degradation.  The shielding installation plan shall be approved
  before construction begins.

3.1.2   Verification

  Before, during, and after the EM shielding and penetration protection
  subsystem installation, the shielding specialist shall verify and approve
  the installation for compliance with the specifications.  Materials and
  methods, shop drawings, and other items for the shielding subsystem shall
  bear an approval stamp of the shielding specialist.  Compliance
  notification shall be provided to the Contracting Officer before materials
  are installed or methods performed.

3.1.3   Inspection

  During and after EM shielding and penetration protection subsystem
  installation, including EM filters and waveguides, a qualified shielding
  specialist shall inspect the installation for compliance with the
  specifications.  The inspection shall be done before a finish or concrete
  topping coat is installed.

3.1.4   Manufacturer's Services

  Services of a manufacturer's representative who is experienced in the
  installation, adjustment, and operation of the equipment specified shall be
  provided.  The representative shall supervise the installation, adjustment,
  and testing of the equipment.

3.1.5   Posting Framed Instructions

  Framed instructions containing wiring and control diagrams under glass or
  in laminated plastic shall be posted.  Condensed operating instructions,
  prepared in typed form, shall be framed as specified above and posted
  beside the diagrams before acceptance testing of the system.

3.2   EM SHIELDING ENCLOSURE INSTALLATION (WELDED STEEL CONSTRUCTION)

  **************************************************************************  
                NOTE:  Either the welded construction or bolted
                construction will be used.  Choose the appropriate
                construction and delete the non-applicable
                paragraph.  
  
                For the EM shielding enclosure, choose either welded
                or bolted construction.  The unused method should be
                deleted from the project specification.  Welded
                construction will usually consist of continuous
                1.897 mm (14 gauge) thick steel plate and angles to
                form the enclosure.  Thicker material may be used if
                it is more cost-effective or required for structural
                reasons.  Welded construction is used when a
                shielded facility requires a long maintainable
                service life of high-level protection, 100 dB
                attenuation, or HEMP protection, 100 dB.  Bolted
                construction is associated with a lower level (50
                dB) of maintained shielding effectiveness.  Bolted
                construction will usually consist of modular panels
                bolted together with metal strips or channels. 
                Panels are commonly plywood with steel sheets
                laminated to one or both sides.  Bolted construction
                is used when a shielded facility's service life is
                short, 10 years or less, or the system is required
                to be demountable for change of location.  This
                system requires more maintenance than a welded
                system and requires access to the panels.  The EM
                shield layout may restrict attenuation testing of
                the enclosure.  It is desirable for large facilities
                to place the shield at least 1 meter (3.3 feet)
                inside the exterior walls, although cost and
                construction restrict this consideration.  The floor
                shielding can be tested by SELDS test but not by
                IEEE STD 299 if it is on grade.  The facility layout
                must be carefully planned to allow for testing and
                shield maintenance.  
  **************************************************************************  
  
  The EM shielded enclosure shall be installed in accordance with this
  specification, the drawings, and the recommendations of the manufacturer
  and EM shielding specialist.  Shielding steel shall be handled and
  installed carefully to prevent damage.  No penetrations of the shield other
  than those indicated on the drawings will be permitted, including fasteners
  and mounting bolts, without prior written authorization from the
  Contracting Officer.

3.2.1   Surface Preparation

  Contacting surfaces shall be cleaned and buffed to ensure firm contact with
  shielding steel.

3.2.2   Control of Warping

  **************************************************************************  
                NOTE:  Steel plates exposed to sunlight and changing
                environmental conditions increase warpage and
                buckling.  
  **************************************************************************  
  
  Warping of steel shielding plates during installation and welding shall be
  kept within 1 mm in 1 meter. 1/8 inch in 10 feet.  Embeds, drive
  pins, and/or anchor bolts or ties shall be used to hold plates in place
  during welding.  Other techniques such as skip welding shall also be used
  to reduce warpage.  The system chosen shall be fully coordinated and
  approved by the Contracting Officer.  Fasteners, drive pins, and other
  shield penetrations shall be sealed with full penetration circumferential
  EM welds.

3.2.3   Placement of Floor Shield

  **************************************************************************  
                NOTE:  The shingle overlap method is one successful
                method of floor shield placement.  Designers have
                the option to select other methods.  
  **************************************************************************  
  
  Placement of the floor shield shall not begin until at least 14 days after
  the pouring of the floor slab and Contracting Officer approval of all
  required submittals.  [The placement of the floor shield shall utilize [the
  shingle overlap method] [_____].]  [Individual floor sheet shall be
  attached on the top and one side only with air-pressure drive tools to the
  floor.  Floor shielding sheets shall be overlapped 50 mm 2 inches
  at joints, bent and laid flat on the concrete floor without voids or gaps,
  and sealed with continuous EM welds at all seams and joints.]  The floor
  shield installation shall start at the center of the space.

3.2.4   Placement of Overslab

  Before placement of the overslab over any portion of the floor shield, the
  Contracting Officer's approval is required.  Both visual and SELDS testing
  of the shielding within the area to be covered must be successfully
  completed, any defects repaired and retested, and full test results
  supplied to the Contracting Officer prior to placement of the overslab.  A
  vapor barrier shall be placed over the floor shield.

3.2.5   Welding

  The shielding work shall be provided in accordance with the performance
  criteria specified.  Shielding steel structurally welded to the steel frame
  shall be welded in accordance with AWS D1.1 and AWS D1.3.  EM
  shielding seams shall be sealed EM-tight by the MIG method, using
  electrodes structurally and electrically compatible with the adjacent steel
  sheets.  [Sheet steel shall be welded to support steel by plug or tack
  welding at 300 mm 12 inches on center, and then sheet seams shall
  be continuously EM welded to seal the enclosure] [_____].  Slag inclusions,
  gas pockets, voids, or incomplete fusion shall not be allowed anywhere
  along welded seams.  Weld failures shall be corrected by grinding out such
  welds and replacing with new welds.  A qualified welder shall perform
  welding, both structural and EM sealing.  Weldments critical to shielding
  effectiveness are shown on the drawings and shall be performed in the
  manner shown on the drawings.  Where both structural integrity and
  shielding quality are required for a given weldment, both criteria shall be
  met simultaneously.  Brazing shall conform to the documents discussed
  above, where practicable, and shall also conform to requirement of AWS
  BRH.  Structural, mechanical, or electrical systems penetrations shall be
  sealed by providing a continuous solid perimeter weld, or braze to the
  shield as specified.  All shield joints and seams shall have a minimum 50
  mm 2 inch overlap and shall be sealed with a continuous solid weld.  
  After testing, the Contracting Officer shall inspect and approve the
  installation prior to covering by other trades.

3.2.6   Wall Shielding Attachment
  **************************************************************************  
                NOTE:  The wall attachment method outlined in this
                paragraph is one successful example.  Site-specific
                methods must be edited at this point in this
                specification.  Note that all attachment
                penetrations must be welded closed.  Metal wall
                studs or furring strips should be of equal or
                greater thickness (gauge) than the shield steel when
                shield steel is welded to supporting metal.  
  **************************************************************************  
  
  Continuous [1.613] [_____] mm [16] [_____] gauge thick furring
  channels spaced not more than 600 mm 24 in on center shall be
  secured to steel wall studs by using self-tapping sheet metal screws.  The
  steel sheets shall be tack welded to the furring strips every 400 mm
  16 in on center horizontally and 600 mm 24 in on center
  vertically.  A continuous full penetration EM weld shall be made to join
  the sheets and form the shield.  Welds shall not form dimples or
  depressions causing fish mouths at the edge of the sheet.

3.2.7   Formed Closures

  Formed closures shall be installed where indicated and/or necessary to
  completely close all joints, openings, enclosures of pipe chases, and
  structural penetrations, columns, and beams.

3.2.8   Sequence of Installation

  Erection of the steel shall be sequenced to prevent steel sheet warpage. 
  Shielding components shall be installed and shall have passed initial
  testing (part 1) before construction of any features that would limit
  access for repairs to the shield.

3.2.9   Door Assemblies

  Doors shall be mounted to perform as specified.  Door framing shall be
  continuously welded to the EM shield.  The structural system supporting the
  door frame shall provide proper support for doors and frame.

3.3   EM SHIELDING ENCLOSURE INSTALLATION (BOLTED CONSTRUCTION)

  **************************************************************************  
                NOTE:  Either welded construction or bolted
                construction will be used.  Choose the appropriate
                construction and delete the non-applicable
                paragraph.  
  
                For the EM shielding enclosure, choose either welded
                or bolted construction.  The unused method should be
                deleted from the project specification.  Welded
                construction will usually consist of continuous
                1.897 mm (14 gauge) thick steel plate and angles to
                form the enclosure.  Thicker material may be used if
                it is more cost-effective or required for structural
                reasons.  Welded construction is used when a
                shielded facility requires a long maintainable
                service life of high-level protection, 100 dB
                attenuation, or HEMP protection, 100 dB.  Bolted
                construction is associated with a lower level (50
                dB) of maintained shielding effectiveness.  Bolted
                construction will usually consist of modular panels
                bolted together with metal strips or channels. 
                Panels are commonly plywood with steel sheets
                laminated to one or both sides.  Bolted construction
                is used when a shielded facility's service life is
                short, 10 years or less, or the system is required
                to be demountable for change of location.  This
                system requires more maintenance than a welded
                system and requires access to the panels. The EM
                shield layout may restrict attenuation testing of
                the enclosure.  It is desirable for large facilities
                to place the shield at least 1 meter (3.3 feet)
                inside the exterior walls, although cost and
                construction restrict this consideration.  The floor
                shielding can be tested by SELDS test but not by
                IEEE STD 299 if it is on grade.  The facility layout
                must be carefully planned to allow for testing and
                shield maintenance.  
  **************************************************************************  
  
3.3.1   Enclosure Panel Installation

  Panels shall be installed in accordance with the shielding manufacturer's
  recommendations.  Shielding panels shall be handled and installed carefully
  to ensure that panels are not damaged.  Exposed surfaces shall be cleaned
  of dirt, finger marks, and foreign matter resulting from manufacturing
  processes, handling, and installation.  Electrical conduits shall be
  installed as close to the EM shield as possible.  Framing-joining system
  bolts shall not be used to mount material and equipment.  Material and
  equipment which must penetrate the shielded enclosure shall be seam welded
  or soldered to both shielding surfaces.

3.3.2   Surface Preparation

  Surfaces shall be cleaned and buffed to ensure good electrical contact with
  shielding surface.  Paint or other coverings on mating surfaces of special
  boxes such as for fire alarm systems, buzzers, and signal lights, including
  areas between box and cover, box and wall, and box and conduit, shall be
  removed.  Insulating material shall be removed to maintain a low-resistance
  ground system and to ensure firm mating of metal surfaces.

3.3.3   Floor Panel Setting

  A polyethylene film 0.15 mm 6 mil thick vapor barrier shall be
  placed over the structural floor of the parent room before any other work
  is set thereon.  A 3 mm 1/8 inch thick layer of hardboard shall be
  provided over this film with joints loosely butted.  Over this layer an
  additional layer of similar filler material of equal thickness as the
  projection of the framing-joining member from the bottom surface of the
  floor panel shall be provided leaving no more than 6 mm 1/4 inch of
  space between the hardboard and the framing-joining member.

3.3.4   Framing-Joining System

  Screws shall be tightened with a calibrated adjustable torque wrench so
  equal torque can be set on each screw.  Proper torque values shall be in
  accordance with the manufacturer's requirements.

3.3.5   Door Assemblies

  The door shall be mounted to perform as required herein.  The door shall be
  through-bolted to the EM shield.

3.3.6   Filter Installation

  **************************************************************************  
                NOTE:  When it is required that the filter unit be
                installed inside the shielded enclosure, the input
                terminal compartment will be EM-tight instead of the
                load terminal compartment, and the filters will be
                located in the load terminal compartment.  This
                arrangement is necessary to prevent radiated EM
                energy within the shielded enclosure from inducing
                EM energy in the power conductors between the
                filters and the point where the conductors pass
                through the shielded enclosure wall.  To provide for
                this arrangement, change the wording as necessary;
                i.e., change the word "load" to read "input" and
                change the words "input" to read "output" or "load,"
                as appropriate.  
  **************************************************************************  
  
  Filters shall be supported independently of the wall shielding.  
  Inspections shall be conducted on filters provided under this
  specification, to verify compliance with the specified requirements.  
  Filters shall be shipped after successful testing and shall be examined
  prior to installation to determine if damage occurred during shipment.  
  Damage, no matter how slight, will be reason for rejection of the filter.

3.4   WAVEGUIDE INSTALLATION

  Penetrations of the EM shield shall be treated with the appropriate
  waveguide method.  Waveguides shall be suitable for piping and for fluids
  or gases contained within, in accordance with specified requirements.

3.5   SHIELDING PENETRATION INSTALLATION

  Penetrations shall be installed in accordance with requirements of the
  penetration schedule and coordinated with system installation.

3.6   QUALITY ASSURANCE

  Quality Control Plan

  A quality control plan shall be developed to assure compliance with
  contract requirements and quality control records shall be maintained for
  construction operations required under this section.  The quality control
  plan shall be submitted to the Contracting Officer.  A copy of testing
  records, as well as the records of corrective actions taken, shall be
  furnished.  The in-progress and final acceptance testing of EM shielding
  and penetration protection system work shall be performed as specified. 
  Deficiencies shall be corrected at no additional cost to the Government. 
  Legible copies of the daily inspection reports shall be maintained by the
  shielding specialist at the project site, and the copies of the
  Construction Quality Control Report shall be delivered to the Contracting
  Officer on the third workday following the date of the report.  The daily
  inspections shall include the type of work being performed during the
  report period and locations, type of testing, deficiencies, corrective
  actions, unsolved problems, and recommendations to assure adequate quality
  control.  Results of inspections and tests performed in accordance with
  this specification shall be attached to the daily Construction Quality
  Control Report.

3.7   SHIELDING QUALITY CONTROL

  The Contractor's organizational structure for shielding quality control
  shall be integrated into the jobsite management.  Testing shall be
  performed by [an independent testing firm] [the shielding installer].

3.7.1   HEMP Hardness Critical Item Schedule

  Hardness critical items shall be identified during the detail drawing
  submittal period.  These items are those components and/or construction
  features which singularly and collectively provide specified levels of HEMP
  protection, such as the EM shield, surge arresters, EM shielded doors,
  shield welding, electrical filters, honeycomb waveguides, and
  waveguides-below-cutoff.

3.7.1.1   Performance Test Plan

  A performance test plan shall be submitted for Contracting Officer
  approval.  Testing shall be accomplished in three parts:  (1) in-progress;
  (2) initial shielded enclosure effectiveness; and (3) final acceptance,
  shield enclosure effectiveness.  The test plan shall include equipment
  listings (including calibration dates and antenna factors) and the proposed
  test report format.  The plan shall also include specific test dates and
  durations during the overall construction period so that the Contracting
  Officer may be scheduled to observe the testing and so that repairs may be
  made to the shield and retests conducted.  This separate testing schedule
  for the EM enclosure shall show the points, during construction, when it
  begins and ends as well as a day-by-day test schedule.  The test plan shall
  indicate proposed dates and duration of lowest and highest frequency tests
  so that the Contracting Officer may be available for these final acceptance
  tests.  A test grid shall be identified and the plan for correlation of
  that grid to the structure shall be provided.

3.7.1.2   Test Reports

  **************************************************************************  
                NOTE:  Specifications and/or quality assurance test
                results of this paragraph may be classified for some
                projects.  Provide appropriate instructions when
                this occurs.  
  **************************************************************************  
  
  Test reports shall include the method of testing, equipment used,
  personnel, location of tests, and test results.  Daily reports of results
  of each test performed on each portion of the shielding system shall be
  submitted to the Contracting Officer within 3 working days of the test. 
  Location of the area tested shall be clearly identified.  Leaks detected
  during testing shall be identified with sufficient accuracy to permit
  relocation for testing in accordance with test procedures.  Reports of
  testing shall be submitted to the Contracting Officer with required
  certification by the testing agency representative or consultant.  Three
  reports (in-progress test report, initial test report, and final acceptance
  test report) shall be submitted in accordance with the format described
  below.

  Cover Page:
  A cover page is required.

  Administrative Data:
  Test personnel.
  Contract number.
  Date of test.

  Authentication.  Contractor personnel responsible for performance of
  the tests and witnessing organization or representatives.

  Contents:
  Shielded facility description.
  Nomenclature of measurement equipment.

  Serial numbers of measurement equipment.  Date of last calibration of
  measurement equipment.  Type of test performed.  Measured level of
  reference measurements and ambient level at each frequency and test point.  
  Measured level of attenuation in decibels at each frequency and test point. 
  Dynamic range at each test frequency and test point.  Test frequencies. 
  Location on the shielded enclosure of each test point.  Actual attenuation
  level at each test point.

  Conclusions: This section shall include results of the tests in brief
  narrative form.

  Number of Copies of the Report:
  [Three] [_____] copies.

3.7.2   Field Testing

  **************************************************************************  
                NOTE:  If a facility is required to fully comply
                with MIL-STD 188 125 by the Joint Chiefs of Staff, a
                military department headquarters, or a major
                command, coordinate with the using organization to
                establish test requirements.  Quality assurance and
                the testing required by appendix A of that standard
                should be performed.  However, the using
                organization may insist on full testing in
                accordance with appendix B as well.  In that case,
                advise the user that, based on limited testing to
                date, no existing EM filter/ESA devices have
                survived the E-2 and E-3 waveforms.  Include
                appropriate cost and scheduling considerations if
                appendix B testing is required.  If MIL-STD 188 125
                is not a requirement, avoid its reference.  
  **************************************************************************  
  
  Testing shall be accomplished in the three parts described below.

3.7.2.1   Testing - Part 1

  Part 1 shall be in-progress testing and shall include inspection, visual
  seam inspection, and seam testing of all EM shielding materials and
  installation.  [In-progress testing of welded shielding shall include
  testing the structural welds to be embedded prior to concrete placement by
  dye penetrant and magnetic particle testing and 100 percent testing of
  wall, ceiling, and floor shielding welds by the SELDS tests.]  [In-progress
  testing of bolted construction shall include 100 percent testing of floor,
  wall, and ceiling shielding seams by the SELDS testing.]  After successful
  completion of in-progress testing (including defect repairs and retest) and
  with prior approval of the Contracting Officer, placement of embedments
  covering may be made to complete the structural systems.  The Contractor
  shall provide an in-progress test report.

3.7.2.2   Testing - Part 2

  Part 2 initial testing shall consist of inspection, visual seam inspection,
  seam testing, and shielded enclosure effectiveness testing after shielding
  and shielding penetrations are completed, but before the installation of
  finish materials over the shielding.  Access to penetrations is required. 
  All [seams] [welds], including shielding and penetrations not tested in
  part 1, shall be SELDS tested.  The initial shielded enclosure
  effectiveness acceptance test shall consist of a MIL-STD 188 125 test
  utilizing specified test frequencies for magnetic and plane wave.  Testing
  shall be conducted in accordance with the paragraph  EM Shielding
  Effectiveness Testing.  These tests shall be performed with the number of
  shield penetrations limited to those required to support the test.  After
  successful completion of Part 2 initial testing (including defect repairs
  and retest) and with prior approval of the Contracting Officer, placement
  of any covering may be made except in areas where penetrations are located. 
  The Contractor shall provide an initial test report.

3.7.2.3   Testing - Part 3

  Part 3 final acceptance testing shall consist of a visual inspection and a
  shielded enclosure effectiveness test of the EM shielding materials and
  installation.  All [seams] [welds], including shielding and penetrations
  not tested in parts 1 and 2, shall be SELDS tested.  Part 3 testing shall
  be performed upon completion of construction and when the building is ready
  for occupancy.  Facilities requiring HEMP protection shall be tested for
  shielding effectiveness in accordance with acceptance test procedures in
  MIL-STD 188 125.  The Contracting Officer shall be notified in writing
  14 days prior to tests to permit adequate monitoring by authorized
  representatives.  Corrective work shall be accomplished immediately upon
  detection that any area has failed to meet the requirements specified. 
  Retesting shall be performed to verify that remedial work done to meet the
  required attenuation has been properly installed.  The Contractor shall
  provide a final acceptance test report.

3.7.3   Weld Inspection

  **************************************************************************  
                NOTE:  Additional welding tests may be specified,
                such as ultrasonic or radiographic tests, but these
                tests are costly.  
  **************************************************************************  
  
  The weld seams shall be visually inspected by a qualified welder during the
  welding operation and after welding is completed.  Completed welds shall be
  inspected after the welds have been thoroughly cleaned by hand or power
  wire-brush.  Welds shall be inspected with magnifiers under bright light
  for surface cracking, porosity, slag inclusion, excessive roughness,
  unfilled craters, gas pockets, undercuts, overlaps, size, and insufficient
  throat and concavity.  Defective welds shall be ground out and replaced
  with sound welds.

3.7.4   Shielded Enclosure Leak Detection System (SELDS) Testing

  **************************************************************************  
                NOTE:  SELDS testing the welds in the floor
                shielding is usually performed on the interior only
                because it is not possible to "sniff" on both sides
                (assuming the shield is on the ground level).  Dye
                penetrant may also be used to test the welds where
                SELDS testing is not possible.  The SELDS can be
                obtained commercially from the following:  1.  
                Carnel Labs Corporation 21434 Osborne Street Canoga
                Park, CA 91304 Telephone:  (818) 882-3977 2.  
                Rayproof Shielding Systems Corporation 50 Keeler
                Avenue Norwalk, CT 06854 Telephone:  (203) 838-4555
                3.  Retlif Corporation 795 Marconi Avenue
                Ronkonkoma, NY 11779 Telephone:  (516) 737-1500  
  **************************************************************************  
  
  The leak detection system shall use a 95- to 105-kHz oscillator and a
  battery operated hand-held receiver.  The receiver or "sniffer" shall have
  a ferrite loop probe capable of sensing leaks within 6 mm 1/4 inch
  of the probe location with a dynamic range of 140 dB.  Testing shall be
  conducted in accordance with test equipment manufacturer's instructions.  
  Test loops or leads shall be placed under the shield floor or into
  inaccessible locations prior to installation to assist in the detection of
  seam leaks in the floor, ceiling and walls.  The loop or lead wires shall
  be placed between the vapor barrier and the structural slab for the floor
  shield with the leads brought to an accessible location.  The test leads
  shall be insulated stranded copper conductors 2-2.5 mm in diameter and
  bonded to the shield only at the end.  Test leads shall be placed in
  plastic conduit for protection and shall not exceed 45 m 150 ft in
  length.  The surface area of the shield will determine the number of test
  leads (drive points) that are required.  Drive points shall be installed on
  the shielding exterior and attached to two sets of diagonally opposing
  corners during construction.  The distance between test lead connections on
  a shield surface shall not be more than 20 m. 66 ft.  The maximum
  testing area shall be 400 sm. 4300 sf.  If the shield area exceeds
  this requirement, additional drive points shall be provided.  Bonding of
  the test leads to the shield is accomplished by brazing or high-temperature
  soldering.  Test leads from the drive points shall be run to a lockable
  test cabinet for connection to the SELDS oscillator.  If more than one test
  cabinet is required for a given area or building, test leads that would be
  common to different surface areas shall be duplicated at each test cabinet
  to ensure that test point parings are maintained.  The Contractor shall
  record the location of the permanent test leads and shall provide this
  information to the Contracting Officer for permanent reference.  Welds and
  seams shall be 100 percent tested.  Seams shall be continuously probed with
  the test receiver set to detect abrupt changes of shielding level greater
  than 10 dB on the shielding unit scale.  Points having a change greater
  than 10 dB shall be clearly marked and shall have the weld repaired to meet
  the specified requirement.  Each repaired point shall be retested until
  there are no points on seams which fail the test.

3.7.5   EM Shielding Effectiveness Testing

  Services of an EM shielding testing specialist, approved by the Contracting
  Officer, shall be furnished to test the shielded enclosure.  The laboratory
  shall be equipped and staffed to perform field tests of EM shielded
  enclosures and shall perform these tests as a normal service.  Test
  equipment used shall have been calibrated within the last 12 months.

3.7.5.1   Test Procedure

  Test procedure and equipment shall be similar to that specified in
  MIL-STD 188 125.  Test frequencies are specified herein.  Test points
  shall be as indicated in Table I.  The grid shall be arranged such that
  corner points of the grid occur at the intersection of three planes (two
  wall surfaces and ceiling or two wall surfaces and floor).  Measurement
  data at all test points shall be recorded, and a grid map for each surface
  tested shall be provided.  For any test point where required attenuation is
  not provided, the Contractor shall correct the discrepancy and retest.  
  Both the results of the test failure and the successful results shall be
  provided. Enclosure effectiveness test for magnetic attenuation shall be
  performed with the antennas located directly opposite each other and
  separated by a distance of 600 mm 2 ft plus the wall thickness.  
  Plane wave attenuation tests shall be performed with the antennas located
  directly opposite each other and with the transmitting antenna placed 300
  mm 1 ft away from the enclosure wall and with the receiving antenna
  set 300 mm 1 ft from the wall for stationary measurements and 50
  mm to 600 mm 2 in to 2 ft from the wall for swept measurements.  The
  magnetic field test and the plane wave test should follow the following
  test sequence.  The calibrations shall be performed at the beginning of
  each test day.  Then the test area shall be set up for the 100 to 400 MHz
  stationary measurement in on to the two required polarizations.  With the
  transmitter off check the receiver sensitivity.  Energize the transmitter,
  and record the fixed measurement data.  Remove the receiving antenna from
  the test stand and perform the swept measurement at the same frequency and
  transmitting antenna polarization.  Rotate the transmitting antenna, and
  perform the second 100 to 400 MHz stationary measurement.  Perform the
  swept measurement for the second transmitting antenna polarization.  
  Reconfigure the equipment for the 900 to 1000 MHz test frequency, and
  repeat the series of four measurements.  To perform the swept measurement,
  the receiving antenna is removed form the test stand and held with a
  dielectric rod at least 300 mm 12 in in length.  A dielectric
  spacer should be attached to the sweeping antenna to assist in maintaining
  the 50 mm 2 in distance from the shield.  A rapid sweep to locate
  hot spots  is made by rotating the polarization and waving the antenna
  through the specified volume.  The final activity of each test day will be
  to repeat the calibrations and verify the consistency with the previous
  calibration results.  Test procedures shall include a definition of all
  test points including but not limited to walls, door frames, accessible
  joints, and around filters and penetrations.  Each EM door shall be tested
  at the locations indicated in Table I.



                               TABLE I - SHIELDING EFFECTIVENESS TEST POINTS

                           Testing Location              Test Points Spacing

Joints between steel panels for        Test every 3 m
roof, walls, and floors                (minimum of one test point per corner
                                       seam)

Corner seams for walls to floor,       Test every 3 m
walls to roof, and wall to wall        (minimum of one test point per corner
                                       seam)

Corners (intersection of               Test at all corners in shield
three surfaces)

Single doors                           Test at each corner; at midpoint
                                       of each side longer than 1.5 m
                                       and at center

Double doors                           Test each separately at same test
                                       point as single doors

WBC vents and panels                   Test in center (on axis) for all
                                       sizes (including single); at all
                                       four corners if 300 by 300 mm
                                       or larger; and at the
                                       midpoint of each side longer than 1.5
                                       1.5 m

At treated penetrations of             Test as close to "on-axis" as
shield (and entry panel and            possible, or orient for maximum
backshield)                            signal


All other shield joints,               Sweep all surfaces at one frequency in
seams, or corners                      the range of 400 MHz to 1 GHz.  
                                       Test every 3 m max. plane wave

Doors                                  Door handles

EM filter enclosures                   Test at each seam corner and midpoint

                                       of each side longer than 1.5 m
                                       at center

EM cabinets and enclosures             Test at each seam corner and each side
                                       1.5 m on center

  NOTE 1.  Each point shall be swept in space 600 mm around the point.



                               TABLE I - SHIELDING EFFECTIVENESS TEST POINTS

                           Testing Location              Test Points Spacing

Joints between steel panels for        Test every 10 ft (NOTE 1)
roof, walls, and floors                (minimum of one test point per corner
                                       seam)

Corner seams for walls to floor,       Test every 10 ft (NOTE 1)
walls to roof, and wall to wall        (minimum of one test point per corner
                                       seam)

Corners (intersection of               Test at all corners in shield
three surfaces)

Single doors                           Test at each corner; at midpoint
                                       of each side longer than 5 ft
                                       and at center

Double doors                           Test each separately at same test
                                       point as single doors

WBC vents and panels                   Test in center (on axis) for all
                                       sizes (including single); at all
                                       four corners if 12 in by 12 in
                                       or larger; and at the
                                       midpoint of each side longer than
                                       5 ft

At treated penetrations of             Test as close to "on-axis" as
shield (and entry panel and            possible, or orient for maximum
backshield)                            signal

All other shield joints,               Sweep all surfaces at one frequency in
seams, or corners                      the range of 400 MHz to 1 GHz.  
                                       Test every 10 ft max. plane wave

Doors                                  Door handles

EM filter enclosures                   Test at each seam corner and midpoint
                                       of each side longer than 5 ft at
                                       center

EM cabinets and enclosures             Test at each seam corner and each side
                                       5 ft on center

  NOTE 1.  Each point shall be swept in space 2 ft around the point.


3.7.5.2   Test Points

  Additional test points shall be measured in accordance with MIL-STD 188
  125 for facilities requiring HEMP protection.  Test points include the
  periphery of doors and covers, handles, latches, power filter penetrations,
  air vent filters, communications line filter penetrations, and points of
  penetration by pipes, tubes, and bolts.

3.7.5.3   Test Methodology

  Antennas shall be oriented for maximum signal pickup.  Each test point
  shall be probed for area of maximum leakage, such as around door frames,
  accessible joints, filters, pipes, and air ducts.  Magnitude and location
  of maximum signal levels emanating from the enclosure shall be determined
  for each accessible wall at a minimum of two locations on each wall, around
  doors, and at penetrations and seams of the enclosure.  Measurement of
  attenuation shall be accomplished in accordance with Table I.

3.7.5.4   Test Frequencies

  **************************************************************************  
                NOTE:  Test frequencies will be in accordance with
                MIL-STD 188 125 when applicable.  
  **************************************************************************  
  
  Testing frequencies for shielded enclosures shall be as follows:

  [Magnetic field:  [14 kHz,] [400 kHz,] and [10.1 MHz] [_____].
  Electric field:  [200 kHz] and [16 MHz] [_____].
  Plane wave:  [100 MHz], [415 MHz], and [1.29] [18] [_____] [GHz].]

  [MIL-STD 188 125 frequencies are as follows:

  Magnetic:  [_____]
  Plane wave:  [_____]]

3.7.6  Weld Testing

  Structural welds to be embedded shall be tested in accordance with AWS
  D1.1 using magnetic particle inspection or dye penetrant inspection and a
  100 percent of the shielding seams by the SELDS testing prior to embedment.

3.8   GROUNDING

  **************************************************************************  
                NOTE:  Grounding method will be in accordance with
                MIL-STD 188 124.  An equipotential ground plane is
                recommended for shielded facilities.  
  **************************************************************************  
  
  The contract drawings indicate the extent and general arrangement of the
  shielded enclosure grounding system.  The grounding methods shall be an
  equipotential grounding plane method in accordance with UL 1283, NFPA
  70, NFPA 77, NFPA 780, IEEE STD 142, MIL-STD 188 124, and
  MIL-HDBK 419.  For additional facility grounding requirements, see
  Section 16415 ELECTRICAL WORK, INTERIOR.

3.9   FIELD TRAINING

  A field training course shall be provided for designated operating and
  maintenance staff members.  Training shall be provided for a total period
  of [8] [_____] hours of normal working time and shall start after the
  system is functionally complete but prior to the final acceptance test. 
  Field training shall cover all the items contained in the operating and
  maintenance manuals.

          -- End of Section --